background image

Safety 

19

LR-06P

6.10  Risks Of Breaking Component During Operation

Materials and procedures, suitable for the designed parameters 

of the lift, have been used by the manufacturer to build a safe 

and reliable product. Operate the lift only for the use it has been 

designed for and follow the maintenance schedule shown in the 

chapter “Maintenance”.

6.11  Risks For Unauthorized Uses

The presence of unauthorized persons next to the lift and on the 

platforms is strictly forbidden during lifting as well as when the 

vehicle has been already lifted

Any use of the lift other than that herein specifi ed can cause 

serious accidents to people in close proximity of the machine.

Fig. 10

Fig. 11

Summary of Contents for LR-06P

Page 1: ...Replace This With Cover PDF...

Page 2: ...Revised 9 04 2020 Read this entire manual before operation begins Record below the following information which is located on the serial number data plate Serial No Model No Date of Installation...

Page 3: ...ormation 5 Product Identification 8 Packing Transport Storage 9 Product Description 10 Technical Specification 11 Safety 16 Installation 20 Operation And Use 23 Maintenance 25 Troubleshooting 27 Parts...

Page 4: ...ch need proper care Indicates prohibition Indicates a possibility of danger for the operators Indicates the direction of access for motor vehicles to the lift BOLD TYPE Important information WARNING b...

Page 5: ...or SERVICE CENTERS AUTHORISED by the manufacturer shall be allowed to carry out lifting transport assembling installation adjustment calibration settings extraordinary maintenance repairs overhauling...

Page 6: ...of any liability for possible damages to objects or people Do not remove or make inoperative the safety devices this would cause a violation of safety at work laws and regulations Any other use which...

Page 7: ...onditions of manufacturer agreement by which this lift was acquired nor increase in any way manufacturer s liability to the customer To The Reader Every effort has been made to ensure that the informa...

Page 8: ...for a period of 12 months starting from the date of the purchase invoice The warranty will come immediately to an end when unauthorized modifications to the machine or parts of it are carried out The...

Page 9: ...and it s fragile parts Hoist and handle only one package at a time 3 3 Storage And Stacking Of Packages Packages must be stored in a covered place out of direct sunlight and in low humidity at a tempe...

Page 10: ...ctro hydraulic operation is described in detail in chapter 8 This chapter describes the lift s principal elements allowing the user to be familiar with the machine As shown in figure 1 the lift is com...

Page 11: ...ckage 350kgs 5 2 Electric Motor Voltage 110V 60Hz 1Ph Power 1 1 KW N Poles 2 Speed 3450 rpm Insulation class IP 54 Motor connection must be carried out referring to the attached wiring diagrams figure...

Page 12: ...Technical Specification 12 LR 06P 5 3 Pump Type Gear Flow rate 0 89 cm3 g Continuous working pressure 200 bar 220bar Figure 2 Layout...

Page 13: ...Technical Specification 13 LR 06P 5 4 Hydraulic Power Unit Figure 3 Hydraulic Power Unit...

Page 14: ...al Specification 14 LR 06P Figure 4 Hydraulic Plan 1 Hydraulic cylinder 6 Oil filter 2 Flow restrictor 7 Motor 3 Non return valve 8 Manual lowering valve 4 Maximum pressure valve 9 Starting valve 5 Ge...

Page 15: ...Technical Specification 15 LR 06P Figure 5 Electrical Wiring Diagram 110V 60Hz 1PH...

Page 16: ...during working is only admitted when the vehicle is lifted and platforms are not running Never use the lift when safety devices are off line People the lift and the vehicles lifted can be seriously d...

Page 17: ...turer to a proper pressure DO NOT try to adjust it to overrun the rated lifting capacity 6 3 Risks For People All risks the personnel could run due to an improper use of the lift are described in this...

Page 18: ...area Fig 8a Fig 8b Fig 8c 6 7 Slipping Risks The risk of slipping can be caused by oil or dirt on the floor near the lift Keep the area under and around the lift clean Remove all oil spills 6 8 Elect...

Page 19: ...the use it has been designed for and follow the maintenance schedule shown in the chapter Maintenance 6 11 Risks For Unauthorized Uses The presence of unauthorized persons next to the lift and on the...

Page 20: ...g workbenches solvent or varnish deposits The relevant standards of the local Health and Safety at Work regulations for instance with respect to minimum distance to wall or other equipment escapes and...

Page 21: ...ystem feeding voltage is equal to that specified in the nameplate on the motor Make sure the electric connections are in compliant with diagrams figure 5 Make sure no leakage or blow up in hydraulic l...

Page 22: ...plete cycles of lowering and lifting and check The safety devices for proper operation Proper oil level in the tank No leakage and blow by in hydraulic line Cylinder for proper operation 7 8 Checks Wi...

Page 23: ...to operate the hydraulic circuit to raise the lift LOWERING LEVER 2 When pressed the hydraulic fluid is released from the cylinder to the oil tank the lift starts to descend 8 2 To Raise The Lift Be s...

Page 24: ...eople and objects Raise the lift by pushing the lifting button until the safety locks are in the released position see Fig 16 then lower the lift by pressing the lowering lever 8 4 To Move The Lift Pu...

Page 25: ...ric and hydraulic equipment exploded views with all data necessary for spare parts ordering list of possible faults and relevant solutions Before carrying out any maintenance or repair on the lift dis...

Page 26: ...in the pump when running and check fixing bolts for proper tightening Safety system check safety devices for proper operation Every 6 months Oil check oil for contamination or ageing Contaminated oil...

Page 27: ...t Bleed the hydraulic system The UP button is faulty Check UP button and connection for proper operation Replace if needed The maximum pressure valve is faulty Check and clean if dirty or replace if n...

Page 28: ...ription Qty 1 J52B200100 Lifting arm 2 2 J52B000005 Pin shaft 2 3 J52B000100 Ramp 2 4 J52B100000 Base 1 5 J52B000002 Lower shaft 1 6 J52BY75000 Hydraulic cylinder 1 7 0212004 Seeger D 25 GB T894 1 4 8...

Page 29: ...ock arm 1 12 J52B300000 Platform 1 13 J52B00003 Upper shaft 1 14 0206092 Screw M6X12 GB T70 2 32 15 J44A000002 Rubber pad 14X110X431 4 16 0212016 Seeger D 18 GB T894 1 20 17 J52B200200 Arm ramp 2 18 J...

Page 30: ...2 0205011 Washer D 10 GB T97 1 2 3 0204005 Self locking nut M10 2 4 J52B120100 Roller support 1 5 J52B100002 Pin 2 6 J52B100001 Roller shaft 2 7 0511122 WHEEL 4 2 8 0212001 Seeger D 12 8 9 0201057 Scr...

Page 31: ...X12 GB T70 1 4 2 7630A 03100 Frame 1 3 0213044 Split pin 2X20 GB T91 2 4 0511122 Wheel 2 5 7630A 03200 Handle 1 6 0205008 Washer D 8 GB T97 1 4 7 0208007 Locking washer D 10 GB T93 2 8 0205011 Washer...

Page 32: ...Hydraulic hose L 3650 1 5 J44AY75001 Piston 1 6 J44AY75002 Cylinder guiding cover 1 7 0202122 Screw M16X30 GB T70 1 1 8 0305007 Guiding ring 70X10X2 5 1 9 0305007 Guiding ring 40X10X2 5 2 10 0311008 S...

Page 33: ...suse negligence carelessness of operation or normal wear and tear In addition this warranty does not cover equipment when repairs or alterations have been made or attempted to the Manufacturer s produ...

Reviews: