2
PAGE
Repair Instructions No.163.01/96
PHE 20 / PHE 26 / PHE 200
Dismantling the
gear box
1
Carefully remove the bearing end plate (9)
from the gear box (2) (lever it off with aid
of a screwdriver).
2
Remove the gasket (3).
3
Expel the armature (8) by hitting the bear-
ing end plate (9) lightly with a plastic ham-
mer.
4
Remove the two screws (4).
5
Put the bearing end plate (9) onto a pad.
Press out the reduction gear shaft (1)
through the sun wheel (7) with aid of a
mandril.
6
Place the reduction gear wheel (6) to a
sleeve (repair tool set; service tool). Press
out the sun wheel (1) with aid of a screw
press.
7
Remove the gear wheel (6), the bearing
cover (5) and the bearing.
Dismantling the
snap die
1
Remove the intermediate wheel (8) with
aid of a plastic hammer and press off the
ball bearings at both sides.
2
Completely remove the locking ring, the
set collar (2), the O-ring (1), and the set
collar from the spindle gear.
3
Remove the O-ring (3), the disc (7), the
spring sleeve (4), the ball, and the sleeve
(6).
4
Remove the rolls (5) and both balls.
5
Applicable for the new SDS-Plus-System
(A): the rolls (5) are replaced by balls.
6
Press out the snap die (9).
3 4
7
9
8
1
5
2
6
3
1
3
2
4
8
6
5
9
7
5
A
4
Summary of Contents for PHE 20
Page 1: ......