22
21
Makes existing pairing inoperative if the
security key is not transmitted to the other
pairs.
Authorise
connection
Following key exchange, this operation is
required to enable connection to an iO
control point that is not part of our brand.
Reset
Connectivities
Deletes all connectivities (pairing of
appliances, connection to the app, connection
to a centralised control point).
Test
Main element
Starts-up the heating element for 5 minutes to check
operation.
Presence
sensor
Activates the sensor to check correct operation.
Radio
Test signal
transmission
Checks that there is good radio
communication between two appliances by
transmitting a signal from one appliance and
receiving a signal on the other appliance. If
the signal is weak, then there is a risk of
losing communication. Check the installation
(distance and/or obstacles between the
appliances).
Test signal
reception
To exit the Expert Menu:
Press
together for 5 seconds
or
Wait
2 minutes
8 - POWER CUT-OFF
Our appliances are compatible with various power cut-off systems.
However, you should not use power cut-off by interrupting the supply
circuit power supply since this system is incompatible with our
appliances. Unintentional and repeated interruptions to the electric
current can cause wear and damage to the electronic boards that will
not be covered by the manufacturer's warranty.
Irrespective of the selected Mode, during power cut-off periods, your
appliance will display "Priority power cut-off sequence".
9 - HELP