SERVICING 

 
 
 

Loss of water velocity through the boiler can lead to temperature rise  
 
 

• 

Consider a sediment vessel on the return to capture sediment deposit 

• 

Blocking immersion heaters irrigation can destroy them 

 

NOTE : The immersion heaters can be destroyed by blockage of the water flow 
 
 
It is essential that a periodical cleaning is carried out on the main heat exchanger and the 
sensors. The water also needs to be clean without any antifreeze or scale remover product 
 
 
Removal of sludge and sediment reduce corrosion risks  
 
 

On first start: 
 
 

Check the electrical operation 
Check each terminal to avoid any contact resistance or temperature rise 
Activate the safety valve manually  
 
 

Monthly servicing 

 
 
Check 
 
 

 

The automatic air vent 

 

The safety valve 

 
 

Biannual servicing 

 
 

Check each terminal to avoid any contact resistance or temperature rise 

 
 
 

Summary of Contents for COMPACTE

Page 1: ...COMPACTE Electric Boilers TECHNICAL MANUAL PO Box 11 Ashton Under Lyne OL6 7TR 44 0 161 621 5960 Fax 44 0 161 621 5966 info atlantic2000 co uk www atlanticboilers com...

Page 2: ...2...

Page 3: ...DIAGRAM 8 STARTING THE BOILER 9 INSTALLATION 10 SERVICING 11 THE COMMISSIONING OF THE COMPACTE 27 THE GUARANTEE ON THE COMPACTE 32 PO Box 11 Ashton Under Lyne OL6 7TR 44 0 161 621 5960 Fax 44 0 161 6...

Page 4: ...th clean and neutral water Main body Steel FE 360 B Volume 70litres Weight 120kg Maximum flow temperature 99 C Safety Thermostat 100 C 50 mm rockwool insulation Flow Return connections sizes 50 Minimu...

Page 5: ...5 SCHEMATIC 1 Conventional Pipework 2 Weather compensated Pipework 3 Weather compensated pipework Radiators or under floor heating...

Page 6: ...ler pump flow should be 5 superior to the sum of heating and DHW primary pump expansion vessel pressure temperature relief valve 3 port valve auto air vent pump non return valve Fill loop pressure rel...

Page 7: ...415 240 Controller Sensor Step 2 Step 1 Lockout Lockout Power Green Yellow Red Limit Stat Flow Switch Pump Overload Enable Lockout S1 Power Switch S2 Controller Switch Earth Green Yellow 4mm Wires 0...

Page 8: ...er cartridge 8 5 31 5 F1 1A type AM F2 1A type AM F3 1A type gG F6 F7 Industrial cylinder cartridge 22 58 36 kW 48 kW 60 W 72 kW F6 50 A 50 A 63 A 63 A KM1 24 kW 24 kW 36 kW 36 kW F7 25 A 50 A 50 A 63...

Page 9: ...ngs stage 1 80 C stage 2 75 C Adjustment Nota Set 1 Stage 1 Set 2 Stage 2 Set 1 must always be Set 2 Minimum setting temperature 20 C Maximum settings temperature 90 C Starting point stage 1 3 C under...

Page 10: ...temperature is shown on the display D Press the 2 key SET 2 for the second stage for 5 seconds the 6 light shine E Adjust the settings with 3 and 4 keys F Validate by pressing the 2 key SET 2 the 1 i...

Page 11: ...y Safety valve 4 Bars maximum An automatic air vent on the boiler flow A blow down valve Electrical wiring The electric boiler compacte should be connected to 415V without neutral The circuit breaker...

Page 12: ...al cleaning is carried out on the main heat exchanger and the sensors The water also needs to be clean without any antifreeze or scale remover product Removal of sludge and sediment reduce corrosion r...

Page 13: ...he boiler s is subject to installed conditions to match the optimum combustion performance results reached at the factory and to ensure the boiler s is are installed according to the conditions of gua...

Page 14: ...heater on site if the defect occurs within 3 calendar years of the commissioning date Definitions The effective actions stipulated in this guarantee are subject to the purchaser complying completely...

Reviews: