Manual, Tool Changer, QC‑50
Document #9620‑20‑B‑50 Tool Changer‑04
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 •
B-11
2.7 Optional Module with J16 Pattern Installation
Tools required: 3 mm hex key, toque wrench
Supplies required: Clean rag, Loctite 222
1.
Place the Tool in a secure location.
2.
Uncouple the Master and Tool plates.
3. Turn off and de‑energize all energized circuits; for example, electrical, air, water, etc. If required, fully
disconnect these circuits.
4. Clean the mounting surfaces.
5.
Align optional module on the Master or Tool plate as shown in
6.
If not using fasteners with pre‑applied adhesive, apply Loctite 222 to (4) M4 socket head cap screws.
7.
Secure the module with (4) M4 mounting fasteners using a 3 mm hex key. Refer to
for proper
torque for your specific mounting fasteners.
8.
Remove all protective caps, plugs, tape, etc from the module prior to operation.
9.
Safely resume normal operation.
Figure 2.3—Optional Module Installation
Master Plate Assembly
Tool Plate Assembly
Fluid/Air Module
(9120-FR2 shown)
(4) M4 Socket Head
Cap Screw
(4) M4 Socket Head
Cap Screw
2.8 Optional Module with J16 Pattern Removal
Tools required: 3 mm hex key
1.
Place the Tool in a secure location.
2.
Uncouple the Master and Tool plates.
3. Turn off and de‑energize all energized circuits; for example, electrical, air, water, etc.
4. Disconnect all utilities.
5.
While supporting the module, remove the (4) M4 socket head cap screws using a 3 mm hex key.
6.
Remove the module from the Master and/or Tool plate.