Manufacturer ATH-Heinl GmbH & CO.KG
- 22 -
2.9.1. Securing the machine
It is recommended that the machine is secured to the floor at the four points provided using M10 anchor
screws and the corresponding dowels.
Drill holes, observing
the necessary drill depth
A and drill diameter of
the dowel manufacturer
Clean out the inside of
the holes
Insert the anchor bolts
into the holes until they
have reached an
appropriate depth.
Tighten the nuts to the
torque specified by the
manufacturer
Clamping thickness B
varies depending on the
floor covering
2.10
Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
Summary of Contents for M72
Page 3: ...BEDIENUNGSANLEITUNG ATH M72 ...
Page 51: ...OPERATING INSTRUCTIONS ATH M72 ...
Page 99: ...MANUEL D UTILISATION ATH M72 ...
Page 147: ...NÁVOD K OBSLUZE ATH M72 ...
Page 195: ...MANUAL DE INSTRUCCIONES ATH M72 ...
Page 243: ...BEDIENINGSHANDLEIDING ATH M72 ...
Page 291: ...INSTRUKCJA OBŁSUGI ATH M72 ...
Page 339: ...NÁVOD NA OBSLUHU ATH M72 ...