® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 14 -
3.
Hydraulic oil
a.
Fill in the hydraulic oil until the marking on the dipstick
b.
For venting of the hydraulic circuit leave the tank cap open for the first 10 lifting movements.
4.
Electrical connection
Hereby must be observed the general and local regulation. Therefore, this step can only be done
only by
trained/skilled persons/experts.
Pay attention to the necessary supply (see technical data).
5.
Install the ramps with locking’s on the scissor lift.
6.
Control before the first lifting
a.
all screws, nuts and so on for tightness
b.
all connections and cylinders for leaks and retighten them if necessary
c.
the oil level
d.
all electrical connections (see electric diagram) as well as the ground cable
e.
that the hydraulic system will be vented completely by lowering the lift completely and
pushing for appr. 15 seconds the button lowering further.
f.
the function of the limit switch (OPT)
g.
that the sliding guides of the base frame and the platform are lubricated (see lubrication
plan)
Summary of Contents for Flex Lift 30
Page 3: ...BEDIENUNGSANLEITUNG ATH Flex Lift 30 ...
Page 47: ...OPERATING INSTRUCTIONS ATH Flex Lift 30 ...
Page 91: ...MANUEL D UTILISATION ATH Flex Lift 30 ...
Page 135: ...NÁVOD K OBSLUZE ATH Flex Lift 30 ...
Page 179: ...MANUAL DE INSTRUCCIONES ATH Flex Lift 30 ...
Page 223: ...BEDIENINGSHANDLEIDING ATH Flex Lift 30 ...
Page 267: ...INSTRUKCJA OBŁSUGI ATH Flex Lift 30 ...
Page 311: ...NÁVOD NA OBSLUHU ATH Flex Lift 30 ...