
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 17 -
Drawing
2.5
Fixing
General and local regulations must be observed. Therefore, these steps should only be
carried out by a trained professional.
The machine must be set up and fixed on sufficiently firm ground, if necessary, according to the minimum
requirements of the information given in the foundation plan.
The machine must be fastened at the points provided with suitable or specified fastening material.
In addition to the ground conditions, the guidelines and instructions of the accident prevention regulations
as well as the workplace regulations must be observed when selecting an installation site.
When assembling on floor coverings, check their load-bearing capacity. A construction expert should be
consulted for inspection when mounting on floor coverings.
Summary of Contents for 7226
Page 47: ...OPERATING INSTRUCTIONS ATH 7226 ...
Page 91: ...MANUEL D UTILISATION ATH 7226 ...
Page 135: ...NÁVOD K OBSLUZE ATH 7226 ...
Page 179: ...MANUAL DE INSTRUCCIONES ATH 7226 ...
Page 223: ...BEDIENINGSHANDLEIDING ATH 7226 ...
Page 267: ...INSTRUKCJA OBŁSUGI ATH 7226 ...
Page 311: ...NÁVOD NA OBSLUHU ATH 7226 ...