4. Now prepare for wiring. Use 4 power cables and 1 PE cable, it is suggested to use a
5-core cable(with PE included) for the convenience of using the water-proof cable
gland. The live wires shall be at least 16mm², PE shall be greater than 6mm². The PE
wire shall be crimped to a M6 size ring terminal. Open the 2 locks at the left side of
the upper front cover and open it. Connect the AC input cables into the
corresponding terminals through the cable gland on the bottom left side and fasten
them(Refer to the Internal view and terminal definition part for wire connection), put
the transparent cover on the terminal block for safety purpose. Connect the network
cable through the hole in front of the AC input cable gland to the RJ45 socket and
fasten the water-proof gland. Turn on the RCBO. Close and lock the upper cover after
checking internal wiring and breaker position. The wiring is then finished.
Notice
1. Only professional personnel can do the wiring, connect the AC input wires in
correct phase order according to the markings on the terminal block.
2. The PE terminal shall be connected to the Earth firmly and reliably!
3. No live work! Turn off the upstream breaker in the distribution panel and the
breaker inside the charging equipment before repairing or maintaining.
4. Please do no disassemble the unit unless authorized!
IV. Parameter configuration
After installed and connected, the charging equipment must first be configured
according to the actual needs of the user. The parametersare configured through the
LCD touch screen. Save the change and exit then the charging equipment can be
used normally.
After the system enters standby, click thebutton marked by the red rectangle in the
above figure to enter the system management page, as shown below.
System management page
Mounting pole installation