ATESS EVD-40D User Manual Download Page 9

V. Operation instruction and LCD 
introduction

5.1 Charging mode and operation

APP/RFID mode: 

Initiate  or  cease  charging  by  scanning  QR  code  using  APP  or  by  swiping  RFID 
card.
You can also use APP for reservation and payment provided that the back-office
server supports such function;

4

5

2

3

1

APP/RFID mode operation process flow

Plug&Charge

Charging will start automatically after EV plugged in. If you want to stop the
charging,  just

 

press

 

the

 

stop

 

icon

 

on

 

the

 

screen.

Plug&Charge mode operation process flow

The  charging  equipment  is  equipped  with  a  7  inch  industrial-grade  resistor  type 
touch panel. The display content is as below,

When powered up, the charging
equipment will show this display,
 

Charging information, which will 
show the status of the charging 
equipment,such as standby, 
charging, fault,etc. 

5

4

1

3

2

QRSCN

QRSCN

STOP

STOP

1

2

4

3

Stop

5.2 LCD interface introduction

Summary of Contents for EVD-40D

Page 1: ...ser manual 86 755 2998 8492 T Shenzhen Atess Power Technology Co Ltd 3rd floor building 9 Henglong industrial park the fourth industrial zone of Shuitian community Baoan district Shenzhen China E info...

Page 2: ...connector works independently Up to 2 EV could be charged at the same time All the above features make it most suitable for outdoor charging We sincerely hope that this product can meet your needs and...

Page 3: ...stem Parameters 4 2 Network parameters 4 3 Protection parameters V Operation instruction and LCD introduction 5 1 Charging mode and operation 5 2 LCD interface introduction 5 3 Appendix Fault code VI...

Page 4: ...n device Note The charging equipment will detect the current status of the lightning arrester module in real time When the lightning protection module is damaged the display will have an alarm indicat...

Page 5: ...d 3 holes for cable hooker mounting on the wall Take out the expansion bolts in thepacking accessory bag hammer the expansion bolts into the holes Remove the nuts and washers for later use 2 Loosen th...

Page 6: ...internal wiring and breaker position The wiring is then finished Notice 1 Only professional personnel can do the wiring connect the AC input wires in correct phase order according to the markings on...

Page 7: ...n may consist of multiple charging equipment 5 Number of power modules Number of power modules inside the mode 4 charging equipment 6 Modules power Rated power setting of power module 7 Plug and Charg...

Page 8: ...Authentication Key OCPP login authentication setting 4 3 Protection parameters The protection related parameters such as voltage current temperature power etc No Parameters Function description 1 2 3...

Page 9: ...e Charging will start automatically after EV plugged in If you want to stop the charging just press the stop icon on the screen Plug Charge mode operation process flow The charging equipment is equipp...

Page 10: ...he 4 digit password A wrong password will cause no response and action System parameters page Network parameters page used to set network related parameters of back office server and the charging equi...

Page 11: ...fault Plug line disconnection fault AC Contactor sticking fault AC Input Overvoltage AC Input Undervoltage BMS communication fault VI Specification Model EVD 40D Dimension mm 775 556 270 L W H Weight...

Page 12: ...t Over temperature protection Short circuit protection Emergency stop protection Lightning protection Leakage protection 25 50 derate since 50 Ip54 5 95 2000m derate for higher than 2000m Forced air c...

Page 13: ...7 3 Contact Company Name Shenzhen Atess Power Technology Co Ltd Address 3rd floor building 9 Henglong industrial park the fourth industrial zone of Shuitian community Baoan district Shenzhen China Web...

Reviews: