4. Now prepare for wiring. Use 4 power cables and 1 PE cable, it is suggested to
use a 5-core cable(with PE included) for the convenience of using the water-proof
cable gland. The live wires shall be at least 16mm², PE shall be greater than
10mm². The PE wire shall be crimped to a M6 size ring terminal. Open the 2 locks
at the left side of the upper front cover and open it. Connect the AC input cables
into the corresponding terminals through the cable gland on the bottom left side
and fasten them(Refer to the Internal view and terminal definition part for wire
connection), put the transparent cover on the terminal block for safety purpose.
Connect the network cable through the hole in front of the AC input cable gland to
the RJ45 socket and fasten the water-proof gland. Turn on the RCBO. Close and
lock the upper cover after checking internal wiring and breaker position. The
wiring is then finished.
Notice
1. Only professional personnel can do the wiring, connect the AC input wires in
correct phase order according to the markings on the terminal block.
2. The PE terminal shall be connected to the Earth firmly and reliably!
3. No live work! Turn off the upstream breaker in the distribution panel and the
breaker inside the charging equipment before repairing or maintaining.
4. Please do no disassemble the unit unless authorized!
IV. Parameter configuration
After installed and connected, the charging equipment must first be configured
according to the actual needs of the user. The parametersare configured through
the LCD touch screen. Save the change and exit then the charging equipment can
be used normally.
After the system enters standby, click thebutton marked by the red rectangle in the
above figure to enter the system management page, as shown below.
System management page
L1
L2
L3
N
PE
Terminal
Wire
2
≥
16mm
≥
AWG5
2
≥
16mm
≥
AWG5
2
≥
16mm
≥
AWG5
2
≥
16mm
≥
AWG5
2
≥
10mm
≥
AWG7