
VPK312 User Manual
5
Installation
Installing the Remote Pad
Follow the steps below to safely install the Remote Pad.
1. Prepare the installation site.
a) Refer to the Panel Mount Cutout diagram (page 22) to cut out an
opening to accommodate the Remote Pad and the connected cables.
b) Install a wall box (not included in the package) to the installation site.
2. Install button caps to the Remote Pad.
3. Connect the unit to LAN using an Ethernet cable.
4. Supply the unit with power by doing one of the following, or both to supply
redundant power.
Connect the Remote Pad to DC power. For more information about
preparing the power adapter, see
Installing a Terminal Block to a Power
Make sure the connected router supports the PSE functionality.
5. Secure the unit to the wall box with two screws.
6. Attach the faceplate.
1
2
3
5
6
Wall Box
(Not included in package)
4
Summary of Contents for VPK312
Page 1: ...12 key Network Remote Pad VPK312 User Manual www aten com...
Page 8: ...VPK312 User Manual viii This Page Intentionally Left Blank...
Page 22: ...Chapter 3 Administrator Settings 14 This Page Intentionally Left Blank...
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......