3
C a s e y P r o 3 G P i t C h i n G M a C h i n e
AssEMBlY & usE
Your Casey Pro 3G pitching machine comes pre-assembled as 3
components, the Throwing Head Assembly (1), the Tripod (2) and
the legs (3).
Remove the Tripod and the three legs from the carton. Depressing
the Spring Clip (4), insert a leg into the Tripod. Be sure the Spring
Clip locks into the alignment hole on the Tripod. Repeat this with the
other two legs.
Loosen the Left/Right Adjustment Lock Handle (5) and mount the
Throwing Head onto the Tripod. Be sure that the Lock is backed out
far enough to allow the Throwing Head to seat itself all the way down
onto the Tripod.
ElECTriCAl
The Casey Pro 3G machine is designed to operate on a 110V AC
power source (220V for International). The speed control is protected
from overload damage by a built-in AC surge protector and a 10 amp
circuit breaker.
Voltage tends to drop over distance and running any equipment
on low voltage can shorten motor life. Therefore, it is important to
always use the proper extension cord with your machine.
Up to 100 feet, the size cord to use is a #16/3. From 100 to 200 feet,
use a #14/3 cord. Over 200 feet, use at least a #12/3 extension cord
or consult a local electrician.
oPErATing
insTruCTions
1. Throwing Head
Assembly
2. Tripod
3. Leg (3 ea.)
4. Spring Clip
5. Left/Right Macro
Adjustment Lock
6. Up/Down Macro
Adjustment Lock
7. Pitch Selection Lock
8. Transport Wheels
9. Ball Feed Chute
10. Speed Controls
11. Handle
12. Control Panel Handle
13. Left/Right Micro
Adjustment Knob
14. Up/Down Micro
Adjustment Knob
Caution:
never lay your machine
on its throwing wheel and
never store or transport
your machine where
temperatures may
exceed 120°F.
Always use a Protective Screen
2
3
4
5
6
7
8
9
10
11
12
13
14
1
FPO