background image

F   Adjust Ball Joint Mechanism

As LCD Manufacturers are constantly releasing new monitor models, Atdec does not accept responsibility if the mounting hole pattern does not comply with the international VESA
standards. Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. Published: 08.12.06 ©

G  Cable Management 

D  Attach Donut Clamps

1.

Loosen both Donut Bolts evenly using the 5mm

Allen Key supplied. 

2.

Slide Donut Clamps over each Pole.

3.

Adjust position of Donut Clamps to suit your

displays, then tighten screws firmly and evenly.

WARNING : DO NOT OVER TIGHTEN!

Tilt Ball Mechanism to access Donut Bolt.

Donut

Bolt

Donut

Bolt

E  Mount Displays

Adjust the Ball Joint Mechanism to suit the weight of
your display. Tighten or loosen screws  

1

to  

4

evenly,

1/4 turn at a time.

LOOSEN

TIGHTEN

Extension

Clips (x4)

75mm

(3”)

75mm

(3“)

100mm

(4”)

100mm

(4”)

or

4

1

2

2.5mm Allen Key

3

2

3

1

LOOSEN

For Displays with 75mm x 75mm (3” x 3”) mounting
hole patterns.

USE

M4 x 10mm

screws

For Displays with 100mm x 100mm (4” x 4”) mounting hole
patterns.

USE

M4 x 12mm or

M4 x 16mm

Cable

Clip’s

(x4)

Cable

Balls (x6)

Leave enough

slack in the

cables to allow

for movement.

Insert display cables into the slots in each
pole, using Cable Balls to hold them in place.

NOTE: 

When the slot in each pole cannot be

used, use the supplied Cable Clip’s to secure

the display/s cables.

Reviews: