Atdec AF-ATC Installation Manual Download Page 2

AF-ATC  Page 2 of 4

1. 

Desk overview

1.1 

Worksurface thickness

2.2 

Place in desired location

2.3 

Screw pressure plates in and 

tighten firmly

.

2.1 

Attach clamp to post

2. 

Post mount configuration

5. 

Install VESA monitor head

VESA monitor 

head

Screen

M4x10/12/16mm

Phillips Head Mounting 

Screws

5.1

 Install VESA monitor head as shown.

100mm

75mm

100mm

75mm

Pressure Plate

Clamp Screw

Allen Key

MIN THICKNESS

 - 10mm (3/8”)

MAX THICKNESS

 - 34mm (1,1/4”)

3. 

Bolt through - Drill Hole

9mm

(3/8”)

25mm

offset

4. 

Bolt Pole to work surface

Note

 orientation of 

plate with pole

5mm

Allen Key

M8x60mm
Screw

Bolt

Through

Plate

Steel

Washer

3.1 

Drill 9mm hole in 

desired post position 

on work surface. 

M8 x 30mm  

screw 

Tighten 

firmly

Place pressure 

plate on end of 

clamp screw

Reviews: