CROSSS-CONNECT FIELD
POWER
CORD
Equipment Room Hardware And Cabling Installation
TRUNK/AUXILIARY
STATION DISTRIBUTION
BUILDING
CABLE SLACK
CABLE SLACK
CABLE SLACK
CABLES
MANAGER
MANAGER
MANAGER
NO. 1
NO. 2
NO. 3
SYSTEM
CABINET
(FRONT)
➀
CABLES RUN FROM SWITCH CABINET TO
TRUNK/AUXILIARY FIELD.
➁
CABLES RUN FROM SWITCH CABINET TO
STATION DISTRIBUTION FIELD.
Figure 3-45. Cable Routing From Switch Cabinet to Cross-Connect
Field (Using Bottom Terminal Blocks)
Routing Cables Using 110-Type Terminal Blocks
Figures 3-46 and 3-47 show the cable routing pattern through the cable
slack manager for a single cabinet installation using connectorized
110-type terminal blocks with the connectors located at the top and
bottom of the terminal blocks, respectively. Cables are routed through
the cable slack manager in either the cabinet or wall troughs. When
needed, the two center troughs can be used.
Port cables are routed through the cabinet trough for parallel runs.
Station cables should use the wall trough. After the cabinet and wall
troughs are filled, use the center trough.
3-67
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...