26
Technical description
Clearances
1. Boiler return connection
2. Boiler flow connection
3. Condensate drain
4. Gas
5. Flue gas outlet
6. Air supply
Pay attention to the minimum distance required between the
boilers, walls and ceiling for installing and removing the hou-
sing.
If you have opted to build the hydraulic part yourself, then
ATAG recommends using
“
Connection set XL
-
W as single
boiler
”
for each boiler
.
Summary of Contents for XL-W 105
Page 2: ...2...
Page 27: ...27 Technical description Declaration of conformity...
Page 44: ...44 Boiler Installation Electrical connection...
Page 45: ...45 Boiler Installation Electrical connection...
Page 52: ...52 Boiler Installation Electrical connection Cascade control...
Page 77: ...77 Accessories Cascade Low loss headers Dimensional sketch for 3905176 LLH DN100 DUO...