Atag Q-Solar Operating Instruction Download Page 7

 Operating instructions ATAG Q-Solar

 Operating instructions ATAG Q-Solar

7

Hydraulic layout Q-Solar

1.

Stainless steel OSS heat exchanger

2.

Control  Management System (CMS)
with Solar module

3.

3-Way valve (CH/DHW)

4.

Boiler pump

5.

DHW coil

6.

DHW sensor

7.

CH-Solar sensor

8.

CH-coil

9.

Modulating 3-way valve (CH-Solar)

10. CH-Solar return sensor
11. Solar coil
12. Drain valve and relief valve solar circuit

13. Solar pump
14. Expansion vessel
15. Cylinder sensor Solar (Delta-T)
16. Absorber sensor Solar (Delta-T)
17. Cylinder drain valve
18. DHW Safety group
19. Thermostatic mixing valve
20. Adjustable flow restriction
21. Solar absorber
22. Pressure/temperature gauge
23. Pressure/temperature gauge

14

Holiday period:

Adjust the  thermostat to the holiday period. See
the BrainQ user manual. The hot water facility can
be switched off by means of the program key 

 on

the control panel.

Re-setting the central heating system:

Switch off the three program keys 

when these are activated.Switch off the power
supply.  When the boiler is being drained one
should take into account that a part of the heating
water will remain in the boiler. When risk of frost
arises one should take care that the remaining
central heating water in the boiler does not freeze.

Holiday
The ATAG BrainQ room
thermostaat is provided
with a holiday programm.
The holiday period can be
adjusted on the thermostat
itself. The central heating
and DHW supply are
switched off during that
period. There is also the
option that only the central
heating is switched off. With
all of these possibilities the
frost protection system is
active.

Turning the boiler off

Summary of Contents for Q-Solar

Page 1: ...tor for UK ATAG Heating UK Ltd Unit 3 Beaver Trade Park Quarry Lane Chichester West Sussex PO19 8NY Phone 01243 815 770 Fax 01243 839 596 E mail info atagheating co uk Internet www atagheating co uk Ditributor for Ireland Total Energy Management Ltd Unit 9 Ballybritt Industrial Estate Monivea Road Galway Ireland Phone 091 769174 Fax 091 769485 E mail info tem ie Internet www tem ie ...

Page 2: ... Reset key 7 The boiler display 8 Water pressure in the central heating system 9 Replenishing the central heating 10 Turning the boiler off 12 Error maintenance and warranty 13 Adjustments 14 Important It is in your own interest that we should know that you have an ATAG boiler Please fill out the warranty card completely and send it back to us Then we can be fully at your service 19 ...

Page 3: ...servicing instructions manual for the installer Readthismanualfullybeforeoperatingtheboiler In case of doubt or errors contact your installer ATAG Heating reserves the right to change the specifications and dimensions without prior notice Work on the boiler must be carried out by a competent person Ref Gas Safety Installation and Use using correctly calibrated instruments with current test certifi...

Page 4: ...nal heating 60 C 04 full under floor heating 50 C factory setting Adjusting the type of installation The boiler is designed in such a way that it will adjust itself automatically to what is necessary for a normal heating system In some cases the installation may have convectors or complete underfloor heating One can easily choose heating installation adjustments appropriate for the system such as ...

Page 5: ...s soon as this temperaturedifferencehasdroppedtoapprox 2 C The pump also switches off automatically as soon asthecylinderhasreachedatemperatureof80 C The controller allows the pump to restart once the temperature of the cylinder has dropped to 75 C Room sealed boiler The boiler retreives its combustionairfromoutside then discharges the flue gasses to the outside Condensing Retrieves heat from the ...

Page 6: ...ertotheuser manual ATAG BrainQ Example SEDBUK ClassA Normally the pipes between absorber and cylinder are insulated However it needs your attention that the pipes during operation can be extreemly hot 120 C 15 Error maintenance and warranty If a fault is detected the boiler will be blocked This will be reflected by an alternate display of Good with an Eof Error or a BL of Blocking and a number cod...

Page 7: ...od Adjust the thermostat to the holiday period See the BrainQ user manual The hot water facility can beswitchedoffbymeansoftheprogramkey on the control panel Re setting the central heating system Switch off the three program keys when these are activated Switch off the power supply When the boiler is being drained one should take into account that a part of the heating water will remain in the boi...

Page 8: ...D s On the left side of the boiler there is a small door Throughthetransparentpartyoucanseetheboiler statusonthedisplay Afteropeningthisdooryouwill find the function keys On the right side of the door you will find an instruction card in a sleeve with an explanation of the display messages and function keys This is described below 13 The boiler will not function directly The automatic de aeration ...

Page 9: ...ntact your installer 12 Replenishing the central heating system The central heating installation needs to be filled with potable drinking water For topping up the installation you use the filling loop according to the following procedure If in any doubt please contact your dealer 1 Switch all functions off heating DHW and pump 2 Briefly push the STEP button P x x water pressure in bar 3 Slowly ope...

Page 10: ...essure in bar If a fault is found the same is shown as described under TheGoodreading Selecting the Technical or Good reading Press the Step key for 5 seconds The display will change from the Good reading to the technical reading or vice versa 11 Water pressure in the central heating system The installation will function optimally with a water pressure of between 1 5 and 1 7 bar Ifthewaterpressure...

Reviews: