background image

 INTRODUCTION 

The  corrosion  resistant  iSteel  Unvented  cylinder  is  made  from  Duplex  Stainless  Steel.  It  is  highly  insulated  with 
environmentally friendly foam enclosed in a rust resistant white steel case. 
 
It is available in Direct, and Indirect versions in a family of 7 sizes from 90 - 300 litres. Twin Coil Indirect units are available 
in 5 sizes from 150 - 300 litres. There is also a range of slim-style units from 60 - 210 litres again in Direct and Indirect 
versions, please contact ATAG Heating Technology about slim-style units. 
 
To help ensure compliance with the relevant Water and Building Regulations all iSteel units are supplied complete with 
the necessary safety and control devices needed to connect to the cold water mains. In order to ensure high flow-rate 
performance with minimum pressure drop even in lower pressure areas, pre-set high quality controls have been selected. 
 
iSteel is approved to demonstrate compliance with Water Regulations and Building Regulations G3 & Part L. 

 STORAGE PRIOR TO INSTALLATION 

iSteel should be stored upright in a dry area and kept in its original packaging until immediately prior to installation. 

 INSTALLATION PREREQUISITES 

This Cylinder should only be installed by a competent installer holding their G3 unvented qualification. The installation of 
this product is also notifiable under the national Building Regulations. 
 

ONCE COMPLETED THIS INSTRUCTION MANUAL IN ITS ENTIRETY SHOULD BE LEFT WITH THE HOME OWNER. 

 WHAT IS BENCHMARK? 

Benchmark places  responsibilities  on both manufacturers and  installers.  The purpose is to  ensure  that  customers are 
provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with 
the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building 
Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be 
provided to the customer for future reference. 
 
Installers are required to  carry  out  installation,  commissioning and servicing work in accordance with  the Benchmark 
Code  of  Practice  which  is  available  from  the  Heating  and  Hotwater  Industry  Council  who  manage  and  promote  the 
scheme. Visit 
  

www.centralheating.co.uk 

 COLD INLET SET – WHAT ARE THE CONNECTIONS? 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 EQUIPMENT SUPPLIED WITH THE CYLINDER 

Cold Water Inlet Set 

LOOSE 

15 x 22mm Tundish 

LOOSE 

Temperature & Pressure Relief Valve 

FITTED 

Expansion Vessel 

LOOSE 

Expansion Vessel Bracket 

LOOSE 

Compression Nut Connection For Expansion Vessel 

LOOSE 

Immersion Heater(s) - dependant on size and configuration 

LOOSE 

Instruction Manual 

LOOSE 

Benchmark Log Book – at the rear of this manual 

LOOSE 

 WATER SUPPLY 

Summary of Contents for iSteel 120

Page 1: ...iSteel INSTALLATION MANUAL ISSUE 2015 V1 FOR MORE INFORMATION GO TO www atagheating co uk...

Page 2: ...eir G3 unvented qualification The installation of this product is also notifiable under the national Building Regulations ONCE COMPLETED THIS INSTRUCTION MANUAL IN ITS ENTIRETY SHOULD BE LEFT WITH THE...

Page 3: ...ditional upstream pressure reducing device should be fitted A minimum of 22mm supply pipe work should ideally be provided and existing 1 2 15mm cold mains pipe work may need to be upgraded Hard water...

Page 4: ...e Sealed or vented primary circuits can be used to comply with normal installation practice the primary pressure should not exceed 3 bar although the coil in the iSteel is suitable for up to 7 bar if...

Page 5: ...nd maintenance of services supplying water for domestic use within buildings and their curtilages Have a vertical section of pipe at least 300mm long below the tundish before any elbows or bends in th...

Page 6: ...the solar heat source Either primary coil connection may be used for flow or return The solar cylinder sensor supplied is inserted into the lower thermostat pocket and the energy cut out into the upp...

Page 7: ...6 N 3 Port Mid Position E HTG ON DHW ON DHW OFF L N E SL 1 2 3 1 2 3 L N E N L N E 2 3 2 Port Heating Cutout combined Duostat 2 Port DHW PUMP Wiring Centre Room Stat Programmer Boiler G Grey Bl Blue...

Page 8: ...your discharge pipework is free from debris and is carrying the water away without spillage over the tundish and release the valves and check that they re seat properly GENERAL Servicing should only...

Page 9: ...ou have a problem in the first year contact the plumber who fitted the unit Thereafter contact the plumber who carries out the annual servicing for you If your iSteel develops a leak we will supply yo...

Page 10: ...n of the boiler and its controls EXPANSION VESSEL Symptoms Possible causes Follow up action Discharge of water from the relief valve Expansion Vessel is too small Vessel needs resizing and installatio...

Page 11: ...INLET CONTROL GROUP Fault Finding Information...

Page 12: ...TUNDISH Fault Finding Information...

Page 13: ...T P RELIEF VALVE Fault Finding Information...

Page 14: ...DUAL THERMOSTAT Fault Finding Information...

Page 15: ...IMMERSION HEATER Fault Finding Information...

Page 16: ...ENERGY CUT OUT Fault Finding Information...

Page 17: ......

Page 18: ......

Page 19: ...to third parties in the normal course of business In this respect the Buyer shall act in the capacity of the Companies commission agent and the proceeds of such sale 6 6 1 shall be held in trust for u...

Page 20: ...ary Pressure Indirect Only 3 Bar Cylinder Data Table Capacity Weight Kg Empty iSteel 90 Direct 90 21 Indirect 88 27 iSteel 120 Direct 120 25 Indirect 118 31 iSteel 150 Direct 150 30 Indirect 148 35 Tw...

Reviews: