GB 15
INSTALLATION
It is best that two people install this cooker hood.
A
A
2--
Ø
(4X)
CO D. 3 DIMAF I
2--
A
C
B
- Unpack the frame and remove the two
screws A to separate the top section from
the bottom section (Fig.1).
- Take the template and
place this against the ceiling with the arrow
on the same side as the hood’s control panel
(Fig.2).
For assembly, screws should be used that
are suitable for the wall type (for example
reinforced concrete, plasterboard, etc.).
If screws and plugs are supplied with the
hood, make sure in advance that these are
suitable for the wall on which the hood is to
be installed.
- Drill four holes Ø 8 in the ceiling and affi x the
four plugs.
- Form the air outlet opening
A
(Fig.3).
- Connect the tube to the opening
A
.
- Take the bracket
B
and secure this to the
ceiling with the four screws
C
(Fig.4).
Fig.4
Fig.3
Fig.1
Fig.2