background image

Introduction

Congratulations with the choice you have made, in choosing an ATAG Blauwe Engel S-HR heating boiler. This can be an boiler with or without
hot water facility.
While developing the ATAG Blauwe Engel S-HR it has been taken into account that the boiler adjusts and adapts itself to the required
temperatures. This means that in most practical situations no needless

 

and / or difficult adjustments are necessary in order to supply the

boiler, the heating installation and domestic hot water facility with heat. It’s of course possible to adjust for each installation type different
settings. In most situations the

 

installer will deliver the boiler ready for you to use.

Despite the intelligence and the operational comfort of the boiler, for you as a user, it can be beneficial to know about the operation of the
boiler.

Description of the boiler

The ATAG Blauwe Engel S-HR is a room sealed condensing and modulating central heating boiler which is designed with or without hot
water facility.
A built in ventilating fan sucks in the combustion air from outside and provides for a complete premixing of gas and air.
The gas mixture is lead through a ceramic burner which is above the heat exchanger.
Due to the small flame height a compact construction is possible. After the combustion gasses have passed through the stainless heat
exchanger, they are flued to outside.
Any condensation formed is drained away to waste.
The S-HR-T is an boiler designed with an integrated hot water facility and is provided with a calorifier and a thermostat mixing valve at the
right hand side which supplies a constant water temperature of 60°C.

Summary of Contents for Blauwe Engel S-HR

Page 1: ...OPERATING INSTRUCTIONS 8G 52 33 01 04 03 We reserve the right to make changes Reliability Innovations...

Page 2: ...am keys with indication lights 4 The boiler display 5 The reading 5 Choosing a technical or a reading 5 The technical reading 5 The reset key 5 Adjusting the flow water temperature 6 Adjusting the typ...

Page 3: ...t of the boiler for you as a user it can be beneficial to know about the operation of the boiler Description of the boiler The ATAG Blauwe Engel S HR is a room sealed condensing and modulating central...

Page 4: ...amount required by the installation As a result unnecessary system noise is prevented When the boiler has been out of operation for a longer period of time the circulation pump will periodically start...

Page 5: ...er is an opening door panel You can already see a part of the control lights and the display through the dark transparant window After opening the door the control panel with the function keys is clea...

Page 6: ...t Press this key in order to let the circulation pump circulate according to the automatic switch program or continually via the central heating installation The circulation pump will circulate contin...

Page 7: ...nces the display will give a reading and if a fault is established this will be reflected with the E for error and a certain number code Choosing a technical or a reading In order to switch from a rea...

Page 8: ...r temperature of the boiler In case of the reading the character P stands for pressure which represents the waterpressure The third and fourth figure indicate the water pressure in bar When a fault oc...

Page 9: ...display will now show The first figure indicates which adjustment is being shown and the third and the fourth figure shows the value of this adjustment The standard adjustment is 85 C flow water temp...

Page 10: ...By means of the or the key the desired installation type can be chosen The choice has to be confirmed with the store key after which one can return by means of the mode key to the reading or the techn...

Page 11: ...drops further and comes below 0 7 bar the display will show a flashing text The Brain thermostat will show the text Waterpressure too low disorder fill water After this the boiler is switched off and...

Page 12: ...Operating instructions S HR series page 2 7...

Page 13: ...Operating instructions S HR series page 2 8 The company reserves the right to change the specifications and dimensions without prior notice E O E...

Page 14: ...20 8RL Phone 01243 673888 Fax 01243 673444 info atagheating co uk www atagheating co uk Total Energy Management Ltd Unit 9 Ballybritt Industrial Estate Monivea Road Galway Ireland Phone 091 769174 Fax...

Reviews: