![ATA SAPHIR 550 Operating Manual Download Page 38](http://html.mh-extra.com/html/ata/saphir-550/saphir-550_operating-manual_2995153038.webp)
»SAPHIR 550/560
Operating Manual
GmbH
- 38 -
Stand: 03.02.2020
6.4
Setting up and connecting the device
»
The machine is to be checked for transport damage before starting setting up work!
»
Plug the connecting cable into a suitable certified socked (machine is designed for clockwise rotation).
The machine has to be erected on a level, stable and flat area.
Connections
Main switch on / off
Compressed air
Water connection
Regulating valve tub rinse
Mains connection
wastewater exit
»
Plug the power cable into an appropriate socket (see technical data).
»
Make the water feed connection (G 1/2“) to the water stop-cock.
»
Connect the drain ducts of the machine (Ø 40) to the drainpipe or to a hose with consistent slope.
The wastewater must be captured in a suitable container and disposed of in accordance with the
specifications on the safety data sheets of the liquids used. Small amounts of wastewater from the
grinding and polishing station can be introduced into the standard drainage system after consultation
with the responsible government agency and with due consideration of the local and government
agency guidelines.
Grinding abrasion should be channelled through a sedimentation basin.
After correct connection, the Saphir 550/560 is ready for operation.
Summary of Contents for SAPHIR 550
Page 42: ...0 1 ...