![Astronergy 5KTL-M2 Installation & Operation Manual Download Page 11](http://html1.mh-extra.com/html/astronergy/5ktl-m2/5ktl-m2_installation-and-operation-manual_2991311011.webp)
9
For CHPI 4.2KTL- M2 and CHPI 5KTL- M2
•
Fix the mounting frame as the figure shows. Do not make the screws to be flush to the wall. Instead, leave 2 to 4mm
exposed.
4.4
Fixed the inverter on the wall
•
Hang the inverter on the mounting frame.
•
Insert safety-lock screws to the bottom leg to secure the inverter.