Roof Down Slope Hole Size

DEGREE OF SLOPE

Secure Temp

®  

S2100+ 

*

Nova Temp

®

  

 

*

Secure Temp

 

GX 

*

ACBI 

*

Roof Pitch

7”

7”

0 *

15” (380 mm)

15” (380 mm)

2/12

15-3/8” (390 mm)

15-3/8” (390 mm)

4/12

16-1/8” (410 mm)

16-1/8” (410 mm)

6/12

16-7/8” (430 mm)

16-7/8” (430 mm)

8/12

18-1/4” (465 mm)

18-1/4” (465 mm)

10/12

19-5/8” (500 mm)

19-5/8” (500 mm)

12/12

21-3/8” (545 mm)

21-3/8” (545 mm)

*  Cross Slope Hole Size

  Put the chimney cap into place.       

    Wash the roof flashing with a solvent or vinegar, then paint it with rust-proof paint.

Table 3

After  reaching  the  location  requiring  the 

elbow, proceed as follows:

Secure Temp

®

 

S2100+ / Nova Temp

®

 

 

/ Secure Temp

 

GX Chimneys 

*

1.  Install the first elbow; turn it in the required 

direction.  Fasten it to the chimney with 

the three (3) 1/2” (12 mm) metal screws 

provided with the elbow.

2. Install the necessary chimney lengths to 

achieve the required offset. Lock the chimney 

lengths together: it is recommended to use 

three (3) 1/2” (12 mm) screws.  If the offset 

length is made of two (2) chimney lengths 

or more, use an offset support halfway up 

the offset.  If penetrating a wall, install a wall 

radiation shield (see 

Figures 27 and 28

).

3. Use  another  elbow  to  turn  the  chimney 

vertically.  Secure the elbow, using three 

(3) 1/2” (12 mm) screws (provided with the 

elbow).

4. Use a plumb-bob to line up the center of 

the hole. Cut a hole for the chimney in the 

ceiling/floor.  Frame this hole as described 

previously (refer to 

Chimney  Installation 

Instructions on 

Page 15

).

5. From below, install a firestop (See 

Figure 

22a

)

.

6.  A support (XST+

*

 or XSO+

*

) must be used 

on the first 15’ section (5 m).

7. Continue with the regular installation.

ACBI Chimney

*

1.  Install the first elbow.  Turn it in the required 

direction.  To lock it in place, turn 1/8 of a 

turn.  Fasten the straps attached to the elbow 

to the surrounding frame, using nails or 

drywall screws

 (

Figure 27

)

.

2. Install the necessary chimney lengths to 

achieve the required offset.  Lock the chimney 

lengths together.  If penetrating a wall, use 

a wall radiation shield.

3. Use  another  elbow  to  turn  the  chimney 

vertically.  Lock it to the chimney. Fasten 

the straps attached to the elbow to the 

surrounding framing using nails or drywall 

screws.

4. Use a plumb-bob to line up the center of the 

hole.  Cut a hole for the chimney in the ceiling.  

Frame this hole as described previously.

5. From below, install a firestop (see 

Figure 

22b

).

6. Continue with the regular installation.

NOTE: When using ACBI chimney, an ACBI7SB

*

 

(H3258

*

) starter section must be used before 

installing an elbow.  When an offset is needed 

immediately off the top of the fireplace, an 

elbow starter section, ACBI7SB30

*

 (H3259

*

is available.

CHIMNEY MODEL ACBI 

*

Collar

Chimney

Flashing

Figure 24

Figure 25

Minimum Chimney Height When Using Elbows

Fireplace Model

MONTEST

Chimney Model

*

Secure Temp S-2100+ / Nova Temp / Secure Temp

 

GX / ACBI

Vertical Installation

3.66 m (12’)

Two (2) Elbows

4.57 m (15’)

Four (4) Elbows

5.18 m (17’)

Table 4

OFFSET CHIMNEY INSTALLATION

After reaching the location requiring the elbow, proceed as follows. The minimum chimney height 

when using elbows is:

NOTES:

• 

Must return to vertical before penetrating ceiling or floor.

• 

A maximum of 2 offsets are allowed.

*

Available from Security Chimneys™ 

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

16

Summary of Contents for MONTECITO ESTATE

Page 1: ...27 Report No 304 7213 EPA Cert No 609 WARNING Hot Do not touch The glass and surfaces of this appliance will be hot during operation and will retain heat for a while after shutting off the appli ance...

Page 2: ...NING Neverleavechildrenunattended when there is a fire burning in the fireplace IMPORTANT GENERAL SAFETY PRECAUTIONS READ AND UNDERSTAND THESE SAFETY RULES BEFORE YOUR FIRST FIRE WARNING Never leave y...

Page 3: ...l void the certification and the warranty of the fireplace and may result in an unsafe installation These appliances are designed to provide supplementalheattotheimmediateareaonly Therefore it is advi...

Page 4: ...be well ventilated for the first few fires Heat Output The Montecito Estate fireplace is the largest memberoftheIHPhighefficiencyfireplaces The heat generated from its fire is more efficiently captur...

Page 5: ...ally go to that level after the fire is fully established and the air boost is closed The unit will burn best with 2 3 pieces of cord wood spaced 1 to 2 inches apart and allowing air to get under the...

Page 6: ...ire follow these steps 1 IMPORTANT Close the fireplace door and the combustion air controls this will stifle the fire 2 Alert your family of the possible danger 3 If you require assistance alert your...

Page 7: ...eplace Replacement glass should be purchased from a IHP dealer see Replacement Parts on Page 23 DO NOT OPERATE THE UNIT WITH CRACKED OR BROKEN GLASS Glass Cleaning The Montecito Estate fireplace is de...

Page 8: ...irection of the wind are important factor affecting the chimney performance To allow a maximum draft and to reduce wind turbulence the chimney must Penetrate the highest part of the roof Be installed...

Page 9: ...dards and the following illustrations Figures 10 and 11 A Frame the fireplace using 2 x 3 or heavier lumber B WARNING Combustible materials can not be used in the space directly above the fireplace e...

Page 10: ...spacer minus 1 2 inch for drywall to be flush with the facing 7 Min B G 2 x 3 Min K Combustion Air Kit 1 Combustible material must be installed flush with the fireplace It may not project in front of...

Page 11: ...er 7 Brick Fireplace Frame Section Top View Figure 12 Only non combustible material should be superposed or project ing over the front of the fireplace Figure 14 50 Min SEE NOTE MANTEL and FACING The...

Page 12: ...d on the bottom right corner of the fireplace If you wish to adjust the blower speed the variable speed control VRUW provided must be installed in line with the wiring Again use a qualified electricia...

Page 13: ...es up to ten 10 feet long 4 Adaptor for fireplace connection Outside Air Installation The outside air assembly may be installed according to the following requirements A Duct length should be kept to...

Page 14: ...orrosion problems 9 Cut and frame square holes in all floors ceilings and roof that the chimney will go through to provide a 2 51mm clearance between thechimneyandanycombustiblematerials Atthepointofp...

Page 15: ...ing in place and seal the joint between the roof and the flashing with roofing pitch see Figures 24 and 25 For sloping roofs place the flashing under the upper shingles and on top of the lower shingle...

Page 16: ...must be used on the first 15 section 5 m 7 Continue with the regular installation ACBI Chimney 1 Install the first elbow Turn it in the required direction To lock it in place turn 1 8 of a turn Faste...

Page 17: ...4 1 8 1375 mm B 17 9 16 446 mm 20 7 16 519 mm 24 5 8 625 mm 28 7 8 733mm 37 3 8 949 mm 42 1067 mm 44 3 4 1137 mm 49 1245 mm 59 9 32 1353 mm 61 3 4 1568 mm Chimney Elbow Offset Height One Length Betwee...

Page 18: ...ey in a insulated chase Straps Chimney ACBI ACBI Starter Section Straps Outside Wall OFFSET CHIMNEY INSTALLATION WITH WALL PENETRATION Support NOTE This illustration is not to scale It represents how...

Page 19: ...ey height exceeds 15 feet 4 6 m Table 6 gives maximum height of supported chimney NOTE FortheACBIchimney asupportsection ACBI7SL mustbeused every 30 feet 9m or an universal support every 20 feet 6m in...

Page 20: ...chimney 2 In the middle of the oval drill a hole in the masonry chimney at 30 3 Increase the size of the hole until a 30 Tubinox liner elbow can be easily slipped through 4 Slide the liner down from t...

Page 21: ...ow 90 8 dia 7B26ZE90 H8948 Elbow 45 8 dia 7B26ZE45 H8949 Telescopic length 8 dia 15 to 26 7B26ZLA H8950 Adjustable length 8 dia 2 5 7B26ZL2A H8951 Length two 2 feet 8KL2 H8954 Length one 1 feet 8KL1 H...

Page 22: ...Caps Black 2 PR SACMEFBK Decorative Screw Caps Brushed Nickel 2 PR SACMEFBN Timer PR SR2425 Ceramic Glass Left PR SR2356G Ceramic Glass Right PR SR2356D Secondary Air Tube 4 PR SR2379 Log Retainers 2...

Page 23: ...SMI30 7XRSMI30 Wall Band XBM XBM Fireplace Model MONTEST Approved Venting Components manu factured by Security Chimneys International only 7 diameter chimney ACBI air cooled Secure Temp GX U S only an...

Page 24: ...M at 2100 F Description Cat Part No 6 Length 7 Dia 7LL6 7LL6 12 Length 7 Dia 7LL12 7LL12 24 Length 7 Dia 7LL24 7LL24 36 Length 7 Dia 7LL36 7LL36 48 Length 7 Dia 7LL48 7LL48 Adjustable Length 7 to 11 7...

Page 25: ...inder may burn at excessive temperatures and may cause damage to the Product or may cause it to function improperly IHP stoves inserts and high efficiency EPA fireplaces are approved for burning dry s...

Page 26: ...e Page 22 for a complete replacement parts list Use only parts sup plied from the manufacturer Normally all parts should be ordered through your IHP distributor or dealer Parts will be shipped at prev...

Reviews: