Installation
900923-00A, 09/2019
Innovative Hearth Products
Aries™ Direct-Vent Fireplaces
39
11.
Install the [Optional] Blower Kit after Installation in the Framing
NOTE:
For steps
11
and
12
, it may be helpful to remove the control compartment door
(
Page 50
)
.
FBK-100, FBK-200, and FBK-250 Kits
An electrical outlet box is provided for the installation of the FBK-100, FBK-200, and FBK-250 forced air blower kits.
Electrical power must be provided to the box to operate the blower. Install the blower kit according to the installation
instructions provided with the kit.
NOTE:
The tab connecting the receptacles of the outlet box must be broken in FBK-100 and FBK-200 blower kit
applications
(
Figure 33
).
12.
Connect the Gas Line
All codes require a shutoff valve mounted in the supply line.
Figure 35
illustrates two methods for connecting the gas
supply. The flex-line method is acceptable in the U.S., however, Canadian requirements vary depending on locality.
Installation must be in compliance with local codes.
NOTE:
Ensure the CPI/IPI switch is set to intermittent mode with the pilot in the OFF position. See control compartment
door label for more information.
NOTE:
A sediment trap is recommended in the gas piping within the home to prevent moisture and debris in the line
from damaging the valve.
NOTE:
Secure all joints tightly using appropriate tools and sealing compounds (ensure propane resistant compounds
are used in propane applications). Seal around the gas line to prevent cold air leakage. Gas line holes and other
openings can be caulked or stuffed with unfaced fiberglass insulation.