After you have installed and lightly assembled the cabinet walls, you can begin to
fully secure all screws and bolts.
Tighten the screws in the following order:
1. Acrylic wall to acrylic wall joint
a. Starting with the acrylic wall joint ensure that the bottom and top of the
panels are still aligned and tighten the
M5 X 30mm
screws starting with
the bottom screw and working your way to the top adjusting the panels
as needed to keep them aligned.
b. After tightening all of the screws wipe away excess sealant allowing the
excess to fill any cracks or gaps paying special attention to the screw
and bolt holes.
c. Inspect the inside corner of the two panels checking for a tight even joint
and adjust if needed.
d. After final inspection, apply a little sealant to each nut to help ensure the
nut stays tight and wipe away any excess.
2. Acrylic wall to glass panel joint one side then the other
e. Starting from the bottom of the joint tighten all the screws working your
way up to the top screw.
f. After completing one side move to the other acrylic wall to glass panel
joint.
g. After securing both joints inspect the interior joint and wipe away any
excess sealant filling in any cracks or gaps in the joints.
3. Acrylic wall to the base
h. Screw the acrylic walls to the base starting at one side and working your
way to the other side.
i. Inspect the interior joint between the acrylic wall and the base to ensure
that sealant fills the entire length of the joint and add more if needed.
4. Ceiling to acrylic wall and glass panel assembly
j. Starting with the
M4 X 35mm
screws located at the front of the ceiling
screw down the ceiling fully into the top rail of the aluminum frame.
k. Using the
M4 x 30mm
bolts fully secure the ceiling down to the acrylic
panel assembly.
When you have finished the final tightening of all screws and bolts conduct a final
inspection of the interior joints and seals and wipe away any excess sealant now
as once it becomes set it will be more difficult to remove.
Step 9 Final assembly and sealing
24