46
5
..
CLIQ™ Go Locking Systems
5.6.5
Key Schedule
Key Schedules
are used to limit key accesses according to a schedule.
If the access for a key needs to be limited to a certain schedule, such as office hours, a
schedule can be configured. When configuring the schedule, a number of separate time
periods per week can be specified and each period can be extended over several days.
5.6.6
Blocked Keys
Cylinders store a list of blocked keys. When a key is blocked, the access for the key to the
cylinder is revoked.
The figure below shows the principle for blocked keys in the following scenario:
•
Key K1 is authorized to cylinder A and B and has been set as a blocked key in the
system.
•
Cylinder A: The cylinder programming job to block K1 has been executed, hence K1
is added to the cylinder's blocked key list.
•
Cylinder B: The cylinder programming job to block K1 has
not
yet been executed,
and K1 is not yet included in the cylinder's blocked key list.
In this case, K1 is not able to open cylinder A, but still able to open cylinder B.
To block a key, see Section 5.5.2
, page 42.
5.6.7
Programming keys and cylinders
Programming jobs are managed by an administrator equipped with a PD and a user key.
The preparation and execution of programming jobs can be split both in time and by user.
Programming jobs can be prepared by an administrator and performed later by the same
administrator or a colleague. The colleague can either be a fellow administrator or a key
holder. Administrators and key holders share the same kind of key and the same authority
to execute pending programming jobs (also called
tasks
).
The following tasks require
key programming
:
•
changing door access by editing the key access list
•
changing key schedule
•
changing key validity
Summary of Contents for Zi IKON CLIQ Go
Page 1: ...CLIQ Go Reseller Guide 2020 02 10 The global leader in door opening solutions ...
Page 53: ...6 Appendix 53 ...
Page 54: ......