background image

 

 

 

PN# 500-22125

 

 

Page 6 

Rev. D, 08/11 

6.

 

SPECIALIZED MOUNTING BRACKETS 

 

PMK-3:  3” Pole/Post Mount Kit – This bracket kit is designed for mounting a Solar 
Power Supply (BPSS) directly to a fence post or  pole  up  to  3”  [76mm]  O.D.    This  kit  is 

available through Securitron or their authorized distributors. 

7.

 

MAINTENANCE 

7.1

 

Cleaning Methods 

 

Use canned/compressed air to blow out dirt and dust from inside the cabinet. 

 

Cleaning once a year is recommended. 

 

Clean every six months in very dusty environments. 

 

Cleaning more often may be required in outdoor applications. 

Summary of Contents for SECURITRON BPSS-10

Page 1: ...0 BPSS 20 Power Supply Specifications Use Environment Outdoor NEMA 3R Cabinet Weight without batteries 14 Lbs 6 4 kg Cabinet Dimensions Length 12 8 325mm Height 12 2 310mm Depth 4 7 119mm Voltage 11 5 14 1 Volts DC Maximum Output Current Continuous Up to 125mA Maximum Output Current While Operating Lock Up to 425mA Operating Temperature Range with batteries 4 to 113 F 20 to 45 C Number of daily lo...

Page 2: ...eing used 4 2 2 Controller Safety SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during installation and maintenance of the controller WARNING Be very careful when working with batteries Lead acid batteries can generate explosive gases and short circuits can draw thousands of amps from the battery Read and follow all instructions provided with the batte...

Page 3: ...sconnect LVD feature along with a red LED indicator Whenever the battery charge state falls below the LVD set point the load will be disconnected and the red LED will light This indicates that the controller has disconnected the load to protect the battery from further discharge and possible damage After some period of recharging the battery such that it recovers to approximately 40 to 50 percent ...

Page 4: ... 3 1 Insert the square nuts into the cutouts at each side of the panel and slide in slot to initial position 2 Assemble swivel brackets with the included hardware to the nuts 3 Tighten screws securely when brackets are adjusted to the desired position Figure 3 PV ARRAY PANEL 6X 10 32 X 7 16 LONG PPH SCREW 2X 10 SPLIT LOCK WASHER 6X 10 PLAIN FLAT WASHER REFERENCE POLE NOT INCLUDED 2X 10 32 SQUARE N...

Page 5: ...nel should be aligned 7 8 degrees east of magnetic South on a compass 5 2 2 TILT ANGLE The panel can be adjusted to the desired tilt angle using the swivel bracket at each side of the panel Simply loosen the pivot and the adjustment screw at each bracket The brackets are marked at 15 increments from 0 horizontal to 90 vertical Align the indicator on the bracket to the desired angle and then tighte...

Page 6: ...to a fence post or pole up to 3 76mm O D This kit is available through Securitron or their authorized distributors 7 MAINTENANCE 7 1 Cleaning Methods Use canned compressed air to blow out dirt and dust from inside the cabinet Cleaning once a year is recommended Clean every six months in very dusty environments Cleaning more often may be required in outdoor applications ...

Page 7: ...he temperature compensation of the controller s PWM set point For example 15 at 0 C the controller will regulate at about 15 1 volts for 12 volt flooded batteries b Check that the proper battery type sealed or flooded has been selected c Check that all wire connections in the system are correct and tight d Disconnect the PV array and momentarily disconnect the lead from the BATTERY positive termin...

Reviews: