FM6100 Series Multi-Point Lock
5
A8058:A • www.sargentlock.com
4/16/10
Copyright
©
2010,
Sargen
t
Manufacturing
Company
,an
A
S
S
A
AB
LO
Y
G
roup
company
.All
right
s
reser
ved
.
Reproduction
in
whole
or
in
par
t
without
the
express
writ
ten
permission
of
Sargen
t
Manufacturing
Company
is
prohibited
.
3
• Thread the Top Bolt Clamp into the threaded hole so that
it extends the top latch to the proper position for pinning.
The Top Bolt Clamp will assure that the top latch is in the
correct position for final installation.
• Prepare the lifting platform installation jig by removing the two
wing fasteners and their washers
• Introduce the lifting platform jig up through the under side of
the shutter as shown.
• Using the two wing fasteners and their washers, secure the
lifting platform jig to the shutter.
The lifting platform jig will now be in position to allow sliding the
lifting platform (shown in step 2) so that it rests against the shelf
of the jig.
Continued on next page………….
Alignment of components in preparation for drilling and pinning
4
Top Bolt Clamp
Lifting platform jig
FOR
TRAINING
PURPOSES
ONLY