Copyright © 2017-2022, ASSA ABLOY Inc. All rights reserved. Reproduction in whole
or in part without the express written permission of ASSA ABLOY Inc. is prohibited.
2
Table of Contents (Continued)
3.2
Removal from Packaging .....................................................................................................................................................
3.2.1
Introduction ............................................................................................................................................................
3.2.2
Remove Panic Device from Shipping Board ......................................................................................................
3.2.3
Remove Horizontal Door Mount ..........................................................................................................................
3.2.4
Remove Horizontal Door Mount (Deco End Cap Option) ..............................................................................
3.2.5
Remove Vertical Door Mount ...........................................................................................................................
3.2.6
Remove Actuator Post Assembly .........................................................................................................................
3.3
Panic Device Installation ..........................................................................................................................................................
3.3.1
Install Panic Device on All Glass Door .................................................................................................................
3.3.2
Install Door Bushings ..............................................................................................................................................
3.3.3
Install Alignment Bushing ........................................................................................................................................
3.3.4
Install Mating Pull ...................................................................................................................................................
3.3.5
Install Actuator Post Assembly ...........................................................................................................................
3.3.6
Install Vertical Door Mount ..................................................................................................................................
3.3.7
Install Horizontal Door Mount ..............................................................................................................................
3.3.8
Install Horizontal Door Mount (Deco End Cap Option) ...................................................................................
3.3.9
Install Panic Device on All Glass Door .................................................................................................................
3.3.10
Horizontal End Threadlocker and Lube Application .......................................................................................
3.3.11
Align Actuator Gauge .........................................................................................................................................
4.
Strike Installation ..........................................................................................................................................................................
4.1
Header Preparation for Single and Double Manual Strikes with Adjustable Door Stops .......................................
4.2
Header Preparation for Folger Adams 310-1 Single and Double Electrical Strikes with Adjustable Door Stops .......
4.3
Header Preparation for HES 1600 Single and Double Electric Strikes with Adjustable Door Stops ...........................
5.
Latch / Adjustable Door Stops Adjustment ................................................................................................................................
5.1
Installation and Adjustment of Door Stop-Strike ..........................................................................................................
5.2
Latch Adjustment for Proper Engaging with the Strike .................................................................................................
5.3
Cylinder Recommendations ....................................................................................................................................................
6.
Cleaning and Maintenance ................................................................................................................................................................
6.1
General Maintenance Instructions .....................................................................................................................................
6.2
Finish Cleaning Instructions ................................................................................................................................................
6.3
Mechanical Maintenance .....................................................................................................................................................
19
19
19
20
20
21
21
22
22
22
22
23
23
24
25
25
26
27
27
28
28
30
32
34
34
36
37
38
38
38
39