
ASSA ABLOY, the global leader in door opening solutions
6
Step 4 – Alignment of
components in preparation for
drilling and pinning
continued
Before continuing to the next step be
certain the top pusher and bottom
bolt are in the correct position.
·
Bottom Bolt should be flush to the
bottom of the shutter.
·
The lifting platform (item 1) should be
moved down the bottom rod and placed
against the shelf of the lifting platform
jig.
·
Next secure the platforms position by
tightening the cone point set screw
(item 2). This will assure the point on
the set screw embeds itself firmly into
the bottom rod.
1
2