
Issue 7-23-2007
23
Besam ICU/CCU - Equal or Unequal Panel
© Copyright 2007 Besam Entrance Solutions. May not be reprinted or reproduced without permission.
Mechanical Installation
Full Breakout Active Leaf Installation Procedure
Surface and Recessed Track Applications
1. Place the door under the cover being
careful not to damage the cover. Then
lift and tilt the wheel brackets on top
of the door onto the track inside the
header. See Fig. 13.
2. Loosen the setscrew at the pin guide
and align so that the pin guide falls
into the track.
3. Install the anti-risers by sliding the
door past the anti-riser block and lin-
ing up the carrier and block. Insert
anti-riser bolt and secure. See Fig. 11,
Pg. 25.
4. Adjust the vertical adjustment screw
on the PSA arm to lift the lead edge of
the door and ball catch into alignment
with the ball catch receiver. See Fig. 12,
Pg. 25.
Note:
if the glass has not been previously
installed, you will need to recheck align-
ment once the glass is in place and read-
just as necessary.
5. Loosen wheel brackets & anti-riser
bolts and adjust door to proper height
using the adjustment screw on the
wheel brackets, taking into account the
floor conditions for the full travel of
the doors. Tighten wheel brackets.
Fig. 13