![aspenhome ICB-495 Assembly Instructions Download Page 3](http://html.mh-extra.com/html/aspenhome/icb-495/icb-495_assembly-instructions_2985031003.webp)
10-26-2017
Page 3/5
aspenhome
R
ASSEMBLY INSTRUCTIONS
MADE IN VIETNAM
STEP 5: Hook the side rails to the headboard and footboard, Attach support leg and center rail to
headboard and footboard by using 5 wood screws(L).
Headboard
Slat bearer
The outside holes match to 6/6 bed rails,
the inside holes match to 6/0 bed rails.
Side Rail
Side Rail
Side Rail
STEP 4: Attach support leg and support panels to center rail by using 6 bolts(G), lock washers(I)
and flat washers(J).
Support Panel
Support Leg (for center rail)
Center Rail
I
J
Rail connector
Center Rail
To Cal King bed, attach rail
connector to the support rail first.
L
L
M
ICB-407D-BCH/BLK/EGG/GRY-1 King/Cal King LP FB w/Drawers
ITEM NO: ICB-495-BCH/BLK/EGG/GRY-KD-1 King Framed Panel HB
ICB-406L-BCH/BLK/EGG/GRY-1 King Side Rails
ICB-410L-BCH/BLK/EGG/GRY-1 Cal King Side Rails
Headboard
G
G
I
J