![aspenhome ICB-495 Assembly Instructions Download Page 2](http://html.mh-extra.com/html/aspenhome/icb-495/icb-495_assembly-instructions_2985031002.webp)
10-26-2017
Page 2/5
aspenhome
R
ASSEMBLY INSTRUCTIONS
MADE IN VIETNAM
STEP 3: Lay footboard upside down on a padded, clean surface. Attach support legs (for pedestal)
and bun feet to footboard using 4 bolts(H), lock washers(I) and flat washers(J). Turn footboard
right side up.
Leveler
Bun Foot
M
I
J
ICB-407D-BCH/BLK/EGG/GRY-1 King/Cal King LP FB w/Drawers
ITEM NO: ICB-495-BCH/BLK/EGG/GRY-KD-1 King Framed Panel HB
ICB-406L-BCH/BLK/EGG/GRY-1 King Side Rails
ICB-410L-BCH/BLK/EGG/GRY-1 Cal King Side Rails
A
B
C
D
A
B
C
D
Left Leg
Right Leg
Headboard
STEP 1: Lay the headboard face down on a soft surface. Attach the left leg and right leg to
headboard by using 6 bolts(A), lock washers(B) and flat washers(C).
STEP 2: Attach the wood stretcher to the legs by using 2 bolts(A), lock washers(B) and flat
washers(C).
Left Leg
Right Leg
Headboard
Wood Stretcher
H