![Ashley AGVF340 Installation And Operating Manual Download Page 20](http://html1.mh-extra.com/html/ashley/agvf340/agvf340_installation-and-operating-manual_2982347020.webp)
20
FREESTANDING LEGS INSTALLATION
To make this model free standing using cast legs,
follow the instructions below:
1. Place heater on its back.
2. Your heater is equipped with four leg
mounting nuts. Place a leg at each nut and
secure leg with bolts provided.
3. The legs are equipped with leveling bolts
needed for leveling adjustments.
4. Stand heater to upright position. Place
heater in desired location. At this point you
may want to secure pedestal to floor with
screws or an “ell” bracket.
5. Hook up gas supply line. Check for leaks
with mild soapy water. see “Installation
Clearances and Gas Connection” section
of this manual.
SECTION VII
ALCOVE INSTALLATION
CAUTION: READ ENTIRE MANUAL BEFORE INSTALLING HEATER.
1. For clearances, see Figure below. The minimum must be met.
2. For Installation and Gas Hookup Connection see “Gas Connection” section of this manual.
CAUTION: The installation must conform with local codes, or in absence of local codes, with National Fuel
Gas Code, ANSI Z223.1/NFPA54.
WARNING: DO NOT USE THIS HEATER IF ANY PART HAS BEEN UNDER
WATER. IMMEDIATELY CALL A QUALIFIED SERVICE TECHNICIAN TO
INSPECT ROOM HEATER AND TO REPLACE ANY PART OF CONTROL
SYSTEM AND GAS CONTROL WHICH HAS BEEN UNDER WATER.
WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION,
SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE,
PERSONAL INJURY OR LOSS OF LIFE. REFER TO THIS MANUAL.
WARNING: ANY CHANGE TO THIS HEATER OR
ITS CONTROLS CAN BE DANGEROUS.”
*ALL DIMENSIONS ARE MINIMUM TO COMBUSTIBLE WALL
REAR WALL
LEFT
WALL
RIGHT
WALL
FRONT OF UNIT
7”
1-1/2”
R
EA
R
W
A
LL
1-1/2”
24”
CEILING
7”
STOVE
Summary of Contents for AGVF340
Page 31: ...31 SIT MILLIVOLT VALVE BASE 8 10 12 3 1 2 6 5 7 4 9 11...
Page 35: ...35 NOTES...