8.3  Cleaning and maintenance 

Use  a non-aggressive cleaning agent  when cleaning;  ventilation valve should be  closed and in accordance with  the 
protection category of the device. 

9  Faults 

9.1  Safety 

Defective or faulty pressure gauges put the operational safety and process safety of the plant at risk, and can lead to a 
risk or injury to persons, the environment or the plant. 

9.2  Conduct in the event of faults 

All defective of faulty devices must be taken out of service. If a repair is required, the device must be sent directly to 
our Repairs Department. We request that all returns of devices are agreed with our Service Department. 

9.3  Fault table 

Possible situations indicating a fault:  

 

Jerky or random movement of the pointer 

 

Pointer does not set to zero for pressure less display 

 

Indications that the measurement system seal is 
imperfect (discoloration of dial display) 

 

Bent or loose pointer 

 

Cracked window 

 

Damage to housing or electrical termination 

 

No or wrong output signal, Zero offset  

Replacement of the pressure gauge is required in the event any of the above exist. 

9.4  Conduct following fault rectification 

See Chapter 7.3 Mounting/Installation  

10 Removal, disposal 

10.1 Safety 

 Residue from process media either within or on uninstalled  gauges can constitute a risk to people, the 
environment and equipment. Adequate precautionary measures must be adopted. If necessary, the devices 
must be cleaned thoroughly (see advice in safety data sheets). 

10.2 Removal 

 

When undertaking servicing of  the device, the pressure lines must be depressurized, the electrical connections 
isolated from the mains supply, and the plant secured against being switched on again. 

 

Take care to uninstall the gauge using a suitable tool. 

10.3 Disposal 

Please help protect the environment by disposing or recycling the device in accordance with the applicable 
regulations. 

11 Appendix 

11.1 Data sheet for Bourdon tube pressure gauge with integrated transmitter T5500E 

Detailed data sheet is available from supplier’s website (see 1.6  Manufacturer’s address, customer services) 
This table refers to specific documents:  

Model 

Description 

Document 

T5500E 

Stainless steel pressure gauge with integrated transmitter  model 
T5500E 

G1.T5500E 

Summary of Contents for t5500e

Page 1: ...5 01EN Installation and Maintenance Instruction Manual Bourdon tube pressure gauge with integrated transmitter model T5500E for industrial application In the following configuration 100 T5500E bourdon...

Page 2: ...g on the device 5 5 Construction and function 6 5 1 Overview 6 5 2 Description of function 6 5 3 Description of components 6 5 4 Accessories 6 6 Transport 7 6 1 Safety 7 6 2 Transport inspection 7 6 3...

Page 3: ...ing This indicates a possibly hazardous situation where failing to follow advice may result in risks to people animals the environment and buildings Information This emphasizes key information for eff...

Page 4: ...e will be no output 2 1 2 Freezing Prohibit freezing of media in pressure port Unit should be drained mount in vertical position to prevent possible overpressure damage from frozen media 2 1 3 Static...

Page 5: ...t The device may only be installed and started up by specialist staff familiar with installation start up and operation of the product Specialist staff are defined as those individuals capable of asse...

Page 6: ...ce and pointer pursuant to EN 837 1 nominal size 100 mm Erl uter ung zus tzlich ei n Hi nweis 5 3 2 Instrument connection The instrument connection is located on the bottom side of the pressure gauge...

Page 7: ...sured the scope of the measurement range and of the protection against special conditions such as vibrations pulsations and pressure spikes A bracket must be installed to support the pressure gauge if...

Page 8: ...nduit that contains high current AC power cables Where possible avoid running the cable near inductive equipment Units with shielded cable electrical termination connect the drain wire to the guard te...

Page 9: ...secured against being switched on again 8 2 Check on function and recalibration Inspection of function and recalibration should be at regular intervals The precise testing cycles should be adjusted i...

Page 10: ...acement of the pressure gauge is required in the event any of the above exist 9 4 Conduct following fault rectification See Chapter 7 3 Mounting Installation 10 Removal disposal 10 1 Safety Residue fr...

Page 11: ...Page 11 of 11 11 2 CE Declaration of conformity...

Reviews: