SERIES 300 Quick Connect Power Panel
Installation Manual
2
381333-476
A
Table of Contents
Limited
Warranty ...................................................................................................................................................... 1
Maintenance
............................................................................................................................................................. 1
Technical Support ..................................................................................................................................................... 1
Prior to Installation
......................................................................................................................................................
3
Shipment: Unpacking and Inspection
......................................................................................................................
3
Initial Installation (for Input and Output Panels)
.....................................................................................................
4
Step 1: Fasten the ASCO SERIES 300 Quick Connect Power Panel to secure base ................................................ 4
S
tep 2: Installing the Conduit .................................................................................................................................... 4
Installation – Input Panels
.........................................................................................................................................
5
Step 3: Wiring the Lug Terminals .............................................................................................................................. 5
Step 4: Determine Phase Rotation ............................................................................................................................. 5
Step 5: Configuring the Phase Rotation Monitor ....................................................................................................... 6
Set-up
...........................................................................................................................................................................
6
Step 6: Review Pre-Operation Checklist under Appendix A prior to operation ....................................................... 6
Step 7: Determining phase rotation of generator ..................................................................................................... 6
Step 8: Conduct a safety test to ensure proper installation ...................................................................................... 6
Step 9: Making Cam Connections ............................................................................................................................ 6
Step
10:
Connect 2 wire auto start circuit ................................................................................................................. 7
Step 11:
Close and lock lower chamber door, allowing cables to exit through smaller cable door ............................. 7
Step 12: Powering Up ............................................................................................................................................... 8
Step 13: Disconnection ............................................................................................................................................. 8
Installation – Output Panels
......................................................................................................................................
9
Step 3: Wiring the Bus Bars ...................................................................................................................................... 9
Step 4: Conduct a safety test to ensure proper installation .......................................................................................... 9
Set-up
...........................................................................................................................................................................
9
Step 5: Review Pre-Operation Checklist under Appendix A prior to operation ....................................................... 9
Step 6: Making Cam Connections ............................................................................................................................ 9
Step
7:
Close and lock lower chamber door, allowing cables to exit through smaller cable door ............................. 10
Step 8: Powering Up ............................................................................................................................................... 10
Step 9: Disconnection ............................................................................................................................................. 10
Appendix A
.................................................................................................................................................................
11
Pre-Operation and Maintenance Checklist ............................................................................................................. 11
Index
..........................................................................................................................................................................
12