Assembly Instruction PLG7
Version 2.00
Page 13
8.
Mounting the platform stair lift onto the travel rails
Two people will be required to install the lift, do not attempt this alone!
If carrying straps are used, these may be attached to the safety bars.
Only carry the lift on the points indicated on the photo to the right!
! A T T E N T I O N !
Do on no account carry the lift using the handle bar!
Firstly turn on the red switch (main fuse) in the fuse box located at the backside of the lift.
Please be aware that the brass charging contacts are removed before positioning the lift onto the rails.
If all preparations are done so far you can insert the lift onto the travel with support of a 2
nd
person.
! A T T E N T I O N !
Please ensure that the plastic covers on the back side of the lift get not scratched or damaged!
If the travel rail is already mounted you can install the lift from the top side of the rail.
By pressing down button on the wall mounted or handheld controls you can run the lift onto the rails.
! A T T E N T I O N !
Make sure that the gear of the emergency break and the (lower) rack fit into one another.
If the teeth don’t fit together the emergency break can be damaged!
9.
Installing the battery charger
The battery charger unit IP 30 should not be installed in the
open air but must be fitted inside the housing supplied for this
purpose.
The position of the charger is left to the discretion of the
operator. It can be positioned near the upper or lower station.
Check the LED of the charger to see whether the batteries are
being recharged. An orange LED shows that the batteries are
charged at the moment.