ASC FLEXHEAD Installation And Maintenance Manual Download Page 3

duct with out gaps. Next, make sure that the (4)

four pre-punched holes in the bottom

mounting block and the (4) holes drilled in step

2A align perfectly. Insert a 3/16” stainless steel

pop rivet into each of the (4) four holes and

rivet into place with the pop rivet gun.

E. 

Apply a duct sealant around the entire outer

edge of the bottom mounting block and on

each of the (4) rivets (Fig. 5s). The installation of

the bottom mounting block is complete.

F. 

Insert bag/gasket assembly over bolt holes

making sure dual polybags protrude through 2

inch hole in bottom mounting block.

Stainless Steel and Galvanized Ductwork Model Installation and Maintenance Manual – 37

Fig. 4s

Fig. 5s

Reviews: