ASC FLEXHEAD Installation And Maintenance Manual Download Page 2

1

FlexHead Location

Determine desirable location for FLEXHEAD

unit in ductwork. FLEXHEAD unit must be

accessible for periodic inspection. For

recommended guidelines and standards for

protection systems in industrial exhaust

systems see Factory Mutual loss prevention

data sheets 7-78, article 2-4. Once desired

location is determined drill a two (2) inch hole

in duct with holesaw (Fig. 1s).

2

Mounting Bottom Block

A.

Place Flexhead bottom mounting block

on duct. Align 2” hole in ductwork with 1 7/8”

hole on FLEXHEAD bottom block. Place a

permanent marker in the (4) four pre-punched

holes and mark (Fig. 2s). Make sure that the 2”

hole in ductwork with 2” hole on FLEXHEAD

bottom block are aligned exactly and that the

bottom flange of mounting block fits securely

to the duct with out gaps.

B. 

Remove bottom mounting block from

ductwork. Using a 3/16” drill bit, carefully drill

out the (4) four holes marked out in step 2A.

C. 

Apply a 1/4” bead of duct sealant around 2”

hole in duct. Apply a 1/4” bead of sealant

around the 2” hole in bottom mounting block

(Figs. 3s and 4s).

D. 

Place Flexhead bottom mounting block onto

ductwork. Make sure that the 2” hole in

ductwork with 2” hole on FLEXHEAD bottom

block are aligned exactly and that the bottom

flange of mounting block fits securely to the

PART I – INSTALLATION OF BOTTOM MOUNTING BLOCK

Stainless Steel and Galvanized Ductwork Model Installation and Maintenance Manual – 36

CAUTION!

Safety glasses, vinyl gloves and particle mask must be worn by installing technician during

FLEXHEAD Stainless Steel and Galvanized Ductwork Model installation.

Fig. 1s

Fig. 2s

Fig. 3s

Reviews: