background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SALAMANDER/CHEESE MELTER  

Manual Instructions 

AESB-24, AESB-36, AECM-24, AECM-36,  

 

 

Manual instructions 

Installation and Operation 

 

 

 

Manueltalimatları

 

Kurulum ve Çal

ıştırma

 

 

Manual de instrucciones 

Uso y mantenimiento 

 

 

 

Manuel d’instructions 

Installation et fonctionnement

 

 

Bedienungshinweise

 

Installation und Betrieb 
 

 

 

Manual do instruções

 

Instalação e Operação

 

 

Ręczny

 

Obs

ługaikonserwacja

 

 

 

 

ES 

EN 

DE 

TK 

FR 

PT 

PL 

Summary of Contents for AECM-24

Page 1: ...s Installation and Operation Manueltalimatlar Kurulum ve al t rma Manual de instrucciones Uso y mantenimiento Manuel d instructions Installation et fonctionnement Bedienungshinweise Installation und B...

Page 2: ...n and assembly 3 2 3 1 UNCRATING 3 2 3 2 INSTALLATION 3 2 4 Gas Connections 4 2 4 1 MANUAL SHUT OFF VALVE 5 2 4 2 PRESSURE REGULATOR 5 2 4 3 THIS APPLIANCE IS EQUIPPED FOR NATURAL GAS 5 2 4 4 PRESSURE...

Page 3: ...design engineered for commercial use only 1 2 IMPORTANT SAFETY INFORMATION WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the...

Page 4: ...damage to the equipment notify the carrier immediately Notification should be made verbally as well as in written form Request an inspection by the shipping company of the damaged equipment Retain al...

Page 5: ...te on freight bill or express delivery and signed by person making delivery File claim for damages immediately Regardless of extent of damages Concealed loss or damage If damage is noticed after unpac...

Page 6: ...4asberprofessional com asberprofessional com 1 Place the support to the wall 2 Put the equipment and use the screw to fasten the equipment to the support 2 4 G a s C o n n e c t i o...

Page 7: ...must be installed at the gas inlet of each piece of equipment The regulators supplied along with ASBER appliances will have 3 4 inlet outlet openings and are adjusted at the factory for 5 WC natural g...

Page 8: ...el who are familiar and experienced with local installation codes Before Installation please read instructions completely and carefully Do not remove permanently affixed labels warnings or plates from...

Page 9: ...e appliance for easy servicing Provision should be made for any commercial heavy duty cooking appliance exhaust combustion waste products to the outside of the building Usual practice is to place the...

Page 10: ...tdown shut OFF gas valve s and turn pilot valve s adjusting screw clockwise to shut off gas to the pilot s 3 3 DAILY SHUT DOWN At the end of the day turn the gas tap dial on the combination gas valve...

Page 11: ...efully scrape spillovers from the drip tray below the cooking surface 2 Wash all exterior and interior surfaces with hot soapy water solution Do not use any abrasives on any portion of the stainless o...

Page 12: ...e thermopile c Turn and set gas tap dial to ON position d Set thermostat to desired temperature e Replace f Replace Fryer does not heat up fast a Insufficient gas b Line clogged c Overloading the frye...

Page 13: ...sberprofessional com ASBER Circuito Exportaci n N 201 Parque Industrial Tres Naciones San Lu s Potos S L P M xico 13105 NW 47th Ave Miami Fl 33054 www asberprofessional com MULTI SOLUTION MANUFACTURER...

Reviews: