Multi Variable Air Conditioners Floor and Ceiling Type Indoor Unit 

 

12 

connection pipe. 

3

 

Arrange insulation of drain hose and pipe clamp after checking the drain system. 

  Models with water pump 
4

 

Fill some water to the water tray of indoor unit as following. 

1)  Connect the drain hose to the other drain connection pipe of water tray and fill about 1L water (as 

shown in 4.3.11). (Remove the drain hose after finishing testing and then put on the plug of water 
tray.) 

2)  Spray 1L water on evaporator with sprayer, as shown in 4.3.12. 

1

 

Start the water to check if water drain smoothly. The starting method of water pump is as below. 

1)  If project debugging of unit has been done, please set the indoor unit in cooling or dry mode. In this 

case, the water pump will operate automatically. 

2)  If electrical wiring of unit hasn’t been done, please open the electric box cover. Connect one phase 

power cord at L1, N or L, N of wiring board; About 60s after connecting power supply, indoor unit will 
report “C0” communication malfunction. In this case, the water pump will automatically operate for 
10min  and  then  stop;  After  checking  the  drain  system,  please  cut  off  power  supply,  disconnect 
power cord and then put on the electric box cover. 

2

 

Check if the water drains smoothly from the drain pipe and check if there is water leakage on the 
connection pipe. 

3

 

Arrange insulation of drain hose and pipe clamp after checking the drain system. 

4.4 Installation of Air Duct 

Notes:

 

There should be insulation layer on air-out duct, air-return duct and fresh air duct to avoid heat loss and 

moisture. Adhere a nail on the air duct and then add thermal sponge with a layer of tin. Fasten it with a nail 
cover and then seal the junction with tin tapes; You can also use other materials that have good insulation 
quality. 

Each air-out duct and air-return duct should be fixed on a pre-made board with iron frame. The junction 

of air duct should be well-sealed in order to prevent air leakage. 

The design and construction of air duct should comply with national requirements. 

The edge of air-return duct is suggested to be more than 150mm away from the wall. Add a filter to the 

air-return opening. 

Please  consider  noise-damping  and  vibration  damping  for  the  design  and  construction  of  air  duct. 

Besides, noise source must be away from people. For instance, do not have the air-return opening installed on 
top of the user(offices, rest area, etc.). 

4.4.1 Installation of Air-out Duct 

1

 

Installation of Rectangular Duct 

 

Summary of Contents for AMV5-22SLD

Page 1: ...onditioners Models AMV5 22SLD AMV5 25SLD AMV5 28SLD AMV5 32SLD AMV5 36SLD AMV5 40SLD AMV5 45SLD AMV5 50SLD AMV5 56SLD AMV5 63SLD AMV5 72SLD Thank you for choosing Air Conditioners please read this own...

Page 2: ......

Page 3: ...re only for your reference For sales or production reasons these graphics are subject to change by manufacturer without prior notice 8 Under the standby status the unit will consume a little power for...

Page 4: ...9 4 3 Installation and Test of Drain Pipe 9 4 4 Installation of Air Duct 12 4 5 Installation of Wired Controller 15 5 Wire Connection 15 5 1 Connection of Wire and Wiring Board Terminal 15 5 2 Power...

Page 5: ...ng into the socket so as to avoid electric shock Please do not connect the ground wire to gas pipe water pipe lightning rod or telephone line Be sure to use the exclusive accessory and part to prevent...

Page 6: ...ay happen Do not expose the unit to the moist or corrosive circumstances Electrify the unit 8 hours before operation Please switch on for 8 hours before operation Do not cut off the power when 24 hour...

Page 7: ...Cooling Heating Fan Dehumidifying Fan Speed Adjustment Temperature Adjustment X fan Function Quiet Function Sleep Function Save Function E heater Function Memory Function Absence Function Timer Functi...

Page 8: ...position 9 others User Manual 1 copy Loosen leaf of Instruction Manual 1 copy harmful substance content table Qualified Certificate 1 copy Bar Code 1 copy 3 2 Location for Installation 1 The top hold...

Page 9: ...ntroller L m feet Wire size mm 2 AWG Material Standard Remarks Light Ordinary polyvinyl chloride sheathed cord 60227 IEC 52 60227 IEC 53 L 250m L 820 1 5feet 2 0 75 2 1 25 2 AWG18 2 AWG16 IEC 60227 5...

Page 10: ...4pc at 40 C ambient temperature when laying across plastic pipe Air switch is D type and used at 40 C If actual installation condition varies please lower the capacity appropriately according to the...

Page 11: ...1000 200 450 474 AMV5 72SLD 1360 415 1300 200 450 474 4 1 2 Punching of Bolt Spots and Bolt Installation Punch holes on the installation area according to the 4 spots on the paper pattern The punching...

Page 12: ...re connection wire of IDU and ODU that need to be connected with the indoor unit Punch holes on the ceiling air return opening or air inlet Ceiling may have to be strengthened to make it level and to...

Page 13: ...be as short as possible and slope downward for at least 1 2 so that condensate can drain out easily 2 Size of the drainage hose must not be smaller than that of the drain pipe 3 Install the drain pip...

Page 14: ...4 3 2 Fig 4 3 3 4 When connecting several drain pipes follow the instruction as indicated in Fig 4 3 4 Choose the drain collecting pipe that matches with unit capacity Fig 4 3 4 5 5 For indoor units t...

Page 15: ...0mm Fig 4 3 9 11 Drain pipes should have a downward slope of at least 1 2 in order to prevent pipes from sagging install hanger bracket at intervals of 1000 1500mm Fig 4 3 10 4 3 3 Test of Drainage Sy...

Page 16: ...off power supply disconnect power cord and then put on the electric box cover 2 Check if the water drains smoothly from the drain pipe and check if there is water leakage on the connection pipe 3 Arr...

Page 17: ...1 Return Air Duct 6 Transition Pipe 2 Canvas Duct 7 Supply Air Duct 3 Return Air Blinds 8 Diffuser 4 Hanger Rod 9 Diffuser Connector 5 Supply Air Outlet 4 4 2 Shape and Size of Air Outlet and Air retu...

Page 18: ...wire 4 Air return from the bottom will produce more noise than air return from the back So we suggest you to add a noise damper and static pressure case to lower noise if you choose air return from t...

Page 19: ...d correct operation 6 Install specialized branch circuit breaker according to related laws and regulations and electrical standards 7 All wiring must use pressure terminal or single wire Multi twisted...

Page 20: ...Use a screwdriver to remove screw on the wiring board of air conditioner 3 Use a round terminal fastener or a plier to securely fasten the round terminal with each core wire of the multi core wire 4 C...

Page 21: ...munication line with the wire clamp on the electric box 5 In order to ensure the reliability of communication between IDU and ODU and the communication among each IDU add a matched resistance supplied...

Page 22: ...Communication between IDU and wired controller is H1 H2 3 One indoor unit can connect two wired controllers master wired controller and sub master wired controller 4 One wired controller is able to co...

Page 23: ...Multi Variable Air Conditioners Floor and Ceiling Type Indoor Unit 19 Fig 5 5...

Page 24: ...its are blocked 2 Check whether grounding wire is in good condition 3 Check whether wire connection is correct 4 Connect the power and check whether the display screen of wired controller shows any ch...

Page 25: ...or windows is open Inlet and outlet of IDU are blocked Setting temperature is too high Refrigerant is insufficient e g refrigerant leakage Poor heating effect The filter is dirty Door or window is op...

Page 26: ......

Page 27: ......

Page 28: ......

Reviews: