
Multi Variable Air Conditioners Floor and Ceiling Type Indoor Unit
8
Fig 4.1.3
Notes:
The length of bolt depends on the installation height of the unit, bolts are field supplied.
4.1.3 Lift the Unit
Lift up the unit to the ceiling and secure it on the bolt. Use specialized nut to secure the unit.
Fig 4.1.4
Notes
:
①
Before installation, please finish the preparation work of all pipes (connection pipe, drain pipe) and
wires (wired controller wire, connection wire of IDU and ODU) that need to be connected with the indoor unit.
②
Punch holes on the ceiling (air return opening or air inlet). Ceiling may have to be strengthened to make
it level and to prevent it from vibration. You may consult user or constructor for details.
③
If the ceiling is not strong enough, you can install a beam bracket in a corner and secure the unit on the
beam.
4.1.4 Horizontal Alignment
After the indoor unit is installed, remember to check the horizontal status of the whole unit. It should be
horizontal from front to back and slant 1% from left to right, following the drainage direction, as shown in
Fig.4.1.5.
Summary of Contents for AMV5-22SLD
Page 2: ......
Page 23: ...Multi Variable Air Conditioners Floor and Ceiling Type Indoor Unit 19 Fig 5 5...
Page 26: ......
Page 27: ......
Page 28: ......