The following is the leak test procedure:
●
Step 1
(1)
Open drain valve AV-5.
(2)
Open the air supply valve for leak testing (AV-11) to pressurize the module's permeate side
with air.
(3)
The water in the permeate side of the module will be displaced by the air. When all the
water is displaced, PIA (permeate pressure gauge) should read the set pressure (180 to
below 200 kPa).
(4)
Maintain the air pressure (PIA) until the pressure gauge reading stabilizes.
Figure 16 Step 1 for PDT
No.
Parts
No.
Parts
AV-1
Raw water feed valve
AV-7
Air supply valve
AV-2
Filtrate valve
AV-8
Chemical supply valve
AV-3
Backwash valve
AV-9
Return valve on chemical drain
side
AV-4
Return valve
AV-10
Return valve for chemical drain
on permeate side
AV-5
Drain valve
AV-11
Air supply valve for leak testing
AV-6
Drain valve
AV-12
Air-bleeding valve for leak testing
Compressor
Receiver tank
Regulator
Flowmeter
Adjusting pressure
AV-5
AV-4
AV-10
AV-2
AV-3
AV-12
AV-8
AV-7
AV-1
AV-6
Feed Tank
PI
I
PIA
I
FI
I
TI
I
PICA
PI
Chemical Tank
Permeate Tank
Drain
Air
Air
BW Pump
Air Vent
Chemical Pump
Filtration Pump
AV-11
AV-9