EN
AS Strömungstechnik GmbH
www.asstroemungstechnik.de
Version date: 09/2020
17
Assembly/commissioning
5. Check that the o-rings (1) and (2) are
in place and undamaged (e.g. Cracks,
tears, and residue are signs of dam-
age) and that the venting channel (3)
is clear of debris.
6. If a code disk is used check that the
code disk (5) is on the dispense head
and that the coding matches that of
the dip tube (6) and thus the chemical.
This means that only the correct three
pins (7) must be missing and the code
disk must not be bent.
»
Do not change any coding on the dip
tube or the code disk if they do not
match. A list of the possible codings is
available on request.