FE-FC
Upper Work Wall
(cont’d)
30
Conference Installation Guide - February 2013
Step 4
Make sure the wall brackets are positioned flat on the wall.
On the office wall behind the panel, mark the position of
the wall brackets by dawing a contour line on the wall
on each side
and
below
the brackets.
Step 6
Reinstall the panel on the support cleat.
Re-install nuts & bolts, do not tighten yet.
Adjust the panel so it is vertically level and tighten bolts.
Step 5
Dismount the panel and remove the wall brackets
by unscrewing the nuts & bolts.
Use the appropriate wall anchoring device
depending on the type of wall.
Install the two wall brackets using the marks previously
made on the office wall.
FRONT-TO-BACK
ADJUSTMENT
Installation of upper wall panels
Note:
If the installation requires
a lower panel,
install
the link brackets to the upper panel before
hanging it to the wall.
See the detailed instructions on the following page.
Summary of Contents for conference
Page 1: ...conference Installation Guide February 2013...
Page 4: ...1 BASES Conference Installation Guide February 2013...
Page 13: ...2 SURFACES Conference Installation Guide February 2013...
Page 17: ...3 ELECTRICITY AND CABLE MANAGEMENT Conference Installation Guide February 2013...
Page 22: ...4 STORAGE Conference Installation Guide February 2013...
Page 26: ...5 PRESENTATION BOARD Conference Installation Guide February 2013...
Page 28: ...6 WORK WALLS Conference Installation Guide February 2013...