6"
FE-FC
?
6¼"
Upper Work Wall
29
Conference Installation Guide - February 2013
Installation of upper wall panels
Step 1
Determine the position (height) of the suspension rail and install it.
For an installation
78" H
. the top edge of the rail must be at
71¾"
For an installation
68" H
. the top edge of the rail must be at
61¾"
The rail will be located 6¼" below the top of the panel.
Step 3
Hang the panel to the support cleat.
Verifiy that the panel is level and at desired height.
If not, remove the panel and redo adjustments from Step 2.
Step 2
Hang the support cleat to the rail.
Make first adjustements (height & level).
Position of the support cleat will be 4" lower than
the top of the completed assembly.
BOTTOM SCREW FOR
HEIGHT ADJUSTMENT
TOP SCREW FOR
FRONT-TO-BACK
ADJUSTMENT
SUPPORT
CLEAT
RAIL
wall
UPPER
PANEL
Use the appropriate wall anchoring device
depending on the type of wall.
Install the suspension rail with screws at both ends
and screws 6" apart along the rail.
78"
or
68"
Summary of Contents for conference
Page 1: ...conference Installation Guide February 2013...
Page 4: ...1 BASES Conference Installation Guide February 2013...
Page 13: ...2 SURFACES Conference Installation Guide February 2013...
Page 17: ...3 ELECTRICITY AND CABLE MANAGEMENT Conference Installation Guide February 2013...
Page 22: ...4 STORAGE Conference Installation Guide February 2013...
Page 26: ...5 PRESENTATION BOARD Conference Installation Guide February 2013...
Page 28: ...6 WORK WALLS Conference Installation Guide February 2013...