background image

SharpStreamer™ Pro PCIE-7210/7211

Installation and Use

P/N: 6806800V01A
March 2018

Summary of Contents for 6806800V01A

Page 1: ...SharpStreamer Pro PCIE 7210 7211 Installation and Use P N 6806800V01A March 2018...

Page 2: ...ferenced in another document as a URL to an Artesyn website The text itself may not be published commercially in print or electronic form edited translated or otherwise altered without the permission...

Page 3: ...and Inspecting PCIE 7210 7211 Card 29 2 2 Environmental Thermal and Power Requirements 30 2 2 1 Environmental and Thermal Requirements 30 2 2 2 Power Requirements 31 2 3 Precautions 32 2 3 1 ESD Prev...

Page 4: ...MicroSD as Boot Device 44 3 8 Temperature Sensors 44 3 9 Clock Distribution 45 3 10 Reset Management 45 3 11 JTAG 46 4 Controls Indicators and Connectors 47 4 1 Connectors 47 4 1 1 PCIE 7210 7211 Fac...

Page 5: ...t Parameter 88 6 Software Information 93 6 1 OS and BBS Information 93 6 2 Firmware Upgrade 93 A MaxCore Firmware Upgrade 95 A 1 MaxCore Firmware Upgrade 95 A 1 1 Obtaining Revisions of Firmware Compo...

Page 6: ...SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 6 Contents...

Page 7: ...pinout 58 Table 4 5 Sleep Signal Status 59 Table 4 6 Faceplate LEDs 60 Table 4 7 CPU1 and CPU2 NIC 82599 LEDs 61 Table 4 8 CPU1 I210 LEDs 62 Table 4 9 CPU2 i210 LEDs 64 Table 4 10 CPU1 and CPU2 USB22...

Page 8: ...SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 8 List of Tables...

Page 9: ...0 LED Top 63 Figure 4 7 Location of CPU2 i210 LEDs Bottom 63 Figure 4 8 Location of CPU1 USB2240 LEDs 64 Figure 4 9 Location of CPU2 USB2240 LEDs 65 Figure 4 10 Reset Button S1 Location 66 Figure 4 11...

Page 10: ...SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 10 List of Figures...

Page 11: ...vironmental and power requirements and installation and removal instructions Functional Description on page 37 provides information about the functional blocks in the SharpStreamer Pro PCIE 7210 7211...

Page 12: ...Unit GPIO General Purpose Input Output HEVC High Efficiency Video Coding ISP Internet Service Provider JTAG Joint Test Action Group MAC Media Access Control MSO Multiple System Operator OTT Over the T...

Page 13: ...oron screenoutputandcoderelatedelements or commands in body text Courier Bold Used to characterize user input and to separate it from system output Reference Used for references and for table and figu...

Page 14: ...property damage message No danger encountered Pay attention to important information Notation Description Part Number Publication Date Description 6806800V01A March 2018 Initial version Document titl...

Page 15: ...trained by Artesyn or persons qualified in electronics or electrical engineering are authorized to install remove or maintain the product The information given in this manual is meant to complete the...

Page 16: ...requency emissions compliance is maintained Operation Product Damage Surface of the Product High humidity and condensation on the product surface causes short circuits Do not operate the product outsi...

Page 17: ...ng the product or electronic components make sure that your are working in an ESD safe environment Product Damage Incorrect installation of the product can cause damage of the product Only use appropr...

Page 18: ...SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A Safety Notes 18...

Page 19: ...tionen ben tigen sollten wenden Sie sich bitte an die f r Sie zust ndige Gesch ftsstelle von Artesyn Das System erf llt die f r die Industrie geforderten Sicherheitsvorschriften und darf ausschlie lic...

Page 20: ...ef hrt werden k nnen dazu f hren dass der Anwender die Genehmigung zum Betrieb des Produktes verliert Boardprodukte werden in einem repr sentativen System getestet um zu zeigen dass das Board den oben...

Page 21: ...ie Funktionsf higkeitmu durcheinenqualifiziertenReparaturdienstwiederhergestelltwerden Installation Besch digung von Schaltkreisen Elektrostatische Entladung und unsachgem er Ein und Ausbau des Produk...

Page 22: ...SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A Sicherheitshinweise 22...

Page 23: ...of 1080p30 H 265 High Efficiency Video Coding HEVC transcodes or four 4 streams of 1080p60 H 265 HEVC transcodes Each CPU offers one 1 4KP60 HEVC or up to two 2 4KP30 HECV transcodes The SharpStreame...

Page 24: ...console interface on faceplate for both processors One SSD interface connected to each PCH supporting upto 128 GB One 1GE Interface connected to each PCH for MaxCore communication I210 1 2 Hardware Ov...

Page 25: ...2 C498 R689 L15 L13 R279 Q10 R248 C482 C479 C170 R667 R674 R673 R666 R665 R662 R664 C490 C172 R675 U47 C174 S6 M34 L17 M11 R698 R697 R696 R693 R692 R686 R685 R699 C1823 C493 C492 R511 R281 U17 C208 C2...

Page 26: ...Table 1 1 Standard Compliances Standard Description 47CFR15 FCC Class A ANSI C63 4 EN 55032 CISPR 32 Class A ICES 003 Class A Radiated Emissions 47CFR15 FCC ANSI C63 4 EN 55032 CISPR 32 Class A ICES...

Page 27: ...2GB PCIE card with two 2GHz Intel Xeon E3 1578L v5 CPUs 32GB SSD per CPU 16GB RAM per CPU Table 1 3 Ordering Information Part Number Description PCIE 7210 2 EOL PCIE card with two 2 GHz Intel Xeon E3...

Page 28: ...Introduction SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 28...

Page 29: ...ment Inspection To inspect the shipment perform the following steps 1 Verify that you have received all items of your shipment One SharpStreamer Pro PCIE 7210 7211 card One printed copy of Quick Start...

Page 30: ...mal Requirements Make sure the card is thoroughly inspected before shipment If any damage has occurred during transportation please contact our Contact Center immediately Operating temperatures refer...

Page 31: ...flow Reference to sea level 500 LFM 2 5 m sec 400 LFM 2 m sec for 35 C Operation Temperature Change 30 C hr 30 C hr Relative Humidity 5 to 85 Non Condensing 5 to 90 Non Condensing but not to exceed 0...

Page 32: ...t touch the circuit with bare hands The static electricity of the human body may damage the ElectroStatic Sensitive Devices ESSDs on the circuit Make sure that you wear an ElectroStatic Discharge ESD...

Page 33: ...shelf Avoid moving as much as possible Movement gathers static electricity around you Do not touch the solder point pin or bare circuit Do not leave the device in the place where others can operate it...

Page 34: ...system in which the PCIE 7210 7211 card is to be installed 3 Remove the system cover Shipping the card along with a server is not recommended If you still need to ship the card along with the server e...

Page 35: ...steps 1 Make sure you are in an ESD safe environment 2 Power off the system disconnect the system fromtheelectricaloutletand peripheralsand remove any cables connected to the card 3 Remove the system...

Page 36: ...10 7211 Installation and Use 6806800V01A 36 4 Remove the screw holding the front panel bracket and gently pull the PCIE 7210 7211 card from the slot 5 Close the cover of the system Place the PCIE 7210...

Page 37: ...n MaxCore system The PCIE 7210 7211 comes in a PCI Express like form factor with MaxCore specific modifications and extensions The PCIE 7210 7211 card contains two Intel Xeon Processors E3 1578L v5 E3...

Page 38: ...ke greater CPU and GPU performance and reduces consumption of power 3 1 2 Intel Skylake PCH The H Processor line of the Skylake is offered in a two chip platform Platform Controlled Hub PCH isaseparat...

Page 39: ...sulting a total 32GB of memory on each PCIE 7210 7211 card 3 3 SSD Memory The PCIE 7211 2 card comes with two on board SSD Memory interfaces one for each processor Each SSD memory supports upto 128GB...

Page 40: ...1 provides 3 3V supply to the CPLD and the Edge connector 2 provides 3 0V RTC power to the PCH1 and PCH2 3 6 Interface Mechanism 3 6 1 High Speed IO subsystem The following are the list of High speed...

Page 41: ...USB2 0 port is connected between each PCH and the Front panel USB connector LPC This interface is used between Edge connector 2 PCH and CPLD This interface is connected to the MaxCore server through t...

Page 42: ...rocess The boot process loads a boot image that is stored in 128 Mbit on board SPI FLASH connected to each PCH device 3 7 Micro SD card There are two microSD slots available on each PCIE 7210 7211 car...

Page 43: ...need to perform the following steps 1 Format the microSD card as FAT32 then copy the recovery firmware onto the card 2 Insert the microSD card into the socket and install the PCIE 7210 7211 card into...

Page 44: ...If no boot record is found then the card tries to PXE boot from the Server If this is not successful the processor reboots and tries the boot sequence again The boot sequence can be modified in the B...

Page 45: ...om PCH device Each CPU has a dual channel memory each memory channel provides an 1066 67 Mhz clock to their respective memory channel 3 10 Reset Management Each PCH reset is controlled by the CPLD CPU...

Page 46: ...Installation and Use 6806800V01A 46 3 11 JTAG The PCIe slot JTAG pins are mapped to the CPLD JTAG programming pins CPLD programming port at connector P2 Independent connector for CPLD E3 1578L v5 E3 1...

Page 47: ...controls indicators and connectors associated with the PCIE 7210 7211 card 4 1 Connectors 4 1 1 PCIE 7210 7211 Faceplate View The following figure shows the faceplate view of PCIE 7210 7211 card Figur...

Page 48: ...r 12V 12 Volt power 3 12V 12 Volt power 12V 12 Volt power 4 GND Ground GND Ground 5 SMCLK PCIE EDGE SMBCLK SMBus System Management Bus Clock JTAG2 PCIe Edge Test Clock TCK 6 SMDAT PCIE EDGE SMBDAT SMB...

Page 49: ...Ground Rx_P 2 Receiver Lane 2 26 GND Ground Rx_N 2 Differential pair 27 Tx_P 3 Transmitter Lane 3 GND Ground 28 Tx_N 3 Differential pair GND Ground 29 GND Ground Rx_P 3 Receiver Lane 3 30 RSVD Reserve...

Page 50: ...erential pair GND Ground 52 GND Ground Rx_P 8 Receiver Lane 8 53 GND Ground Rx_N 8 Differential pair 54 Tx_P 9 Transmitter Lane 9 GND Ground 55 Tx_N 9 Differential pair GND Ground 56 GND Ground Rx_P 9...

Page 51: ...ir 74 Tx_P 14 Transmitter Lane 14 GND Ground 75 Tx_N 14 Differential pair GND Ground 76 GND Ground Rx_P 14 Receiver Lane 14 77 GND Ground Rx_N 14 Differential pair 78 Tx_P 15 Transmitter Lane 15 GND G...

Page 52: ...l CON SLOT ID1 10 GND Ground CON SLOT ID2 11 PCH2_U ART1_EX T_TXD UART1 transmitter of PCH2 CON SLOT ID3 Mechanical Key 12 PCH2_U ART1_EX T_RXD UART1 receiver of PCH2 GND Ground 13 GND Ground PCH1_UAR...

Page 53: ...ter of PCH2 Diff pair 22 GND Ground PCH2_GE0 _EXT_TX_ D_M 23 PCH1_GE 0_EXT_R X_D_P Gigabit Ethernet port receiver of PCH1 Diff pair GND Ground 24 PCH1_GE 0_EXT_R X_D_M GND Ground 25 GND Ground PCH1_GE...

Page 54: ...NC Not connected 35 NC Not connected NC Not connected 36 NC Not connected NC Not connected 37 NC Not connected NC Not connected 38 NC Not connected NC Not connected 39 GND Ground GND Ground 40 PCH2_L...

Page 55: ...B2_IOM OD_DP USB2 port of PCH2 PCH1_CLK OUT_LPC0 LPC clock of PCH1 51 PCH2_US B2_IOM OD_DM Differential pair GND Ground 52 GND Ground PCH1_USB 2_IOMOD_ DP USB2 port of PCH1 53 GND Ground PCH1_USB 2_I...

Page 56: ...TA0_RX_ D_P SATA0receiverportofPCH2 Diff pair GND Ground 63 PCH2_SA TA0_RX_ D_M GND Ground 64 GND Ground PCH2_SATA 0_TX_D_P SATA0 transmitter port of PCH2 Diff pair 65 GND Ground PCH2_SATA 0_TX_D_M 66...

Page 57: ...TX_D_M 74 PCH1_SA TA0_RX_ D_P SATA0 receiver port of PCH1 Diff pair GND Ground 75 PCH1_SA TA0_RX_ D_M GND Ground 76 GND Ground PCH1_SATA 0_TX_D_P SATA0 transmitter port of PCH1 Diff pair 77 GND Ground...

Page 58: ...e micro USB UART port is the UART0 port of the PCH through CP2105 F01 GMR silabs device 4 1 5 MicroUSB Port The micro USB port is the USB 1 port of the PCH Table 4 3 Micro USB UART port pinout Pin Nam...

Page 59: ...15 D13 D14 D16 D14 D12 and D10 Figure 4 2 General Usage LEDs Table 4 5 Sleep Signal Status LED Representation Value Status D17 CPU 2 In sleep state 1 LED will not glow CPU 2 Out of sleep state 0 LED w...

Page 60: ...and D15 will be glowing Figure 4 3 Faceplate LEDs Table 4 6 Faceplate LEDs LED Processor Value Status D21 CPU1 Blinking Red On board power failure CPU shutdown by OS Green CPU power UP None CPU power...

Page 61: ...CTIVITY Asserted steady when link is established and there is no transmit or receive activity Blinking when there is link and receive or Transmit activity D36 Green Port 1 CPU1 LINK ACTIVITY Asserted...

Page 62: ...established and there is no transmit or receive activity Blinking when there is link and receive or Transmit activity Figure 4 5 Location of CPU1 i210 LEDs Table 4 8 CPU1 I210 LEDs Label Color Status...

Page 63: ...nnectors SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 63 The following figure shows the CPU2 i210 LEDs D27 D28 and D29 Figure 4 6 Location of CPU2 I210 LED Top Figure 4 7 Location...

Page 64: ...V01A 64 The following figure shows the CPU1 USB2240 LED D3 Table 4 9 CPU2 i210 LEDs Label Color Status Description Debug LEDs D27 Green I210 Default Link Up Activity 200 ms on 200 ms off D28 Green I21...

Page 65: ...nstallation and Use 6806800V01A 65 The following figure shows the CPU2 USB2240 LED D18 Figure 4 9 Location of CPU2 USB2240 LEDs Table 4 10 CPU1 and CPU2 USB2240 LEDs Label Color Status Description Deb...

Page 66: ...on the card get reset The following figure shows the reset button location on the PCIE 7210 7211 card There are two reset buttons available at the faceplate of the PCIE 7210 7211 card By pressing the...

Page 67: ...ch S6 Settings Switch Description Default S6 1 OFF CPU power control from MaxCore ON CPU power control from onboard CPLD OFF CPU Power control from MaxCore S6 2 OFF 3 0V RTC power from MaxCore ON 3 0V...

Page 68: ...llation and Use 6806800V01A 68 4 4 Switch Settings for MC1000 and Micro Platforms Following are the switch settings for power up of PCIE 7210 7211 card under MC1000 Micro platforms Figure 4 12 Switch...

Page 69: ...01A 69 Table 4 12 Switch Settings for MaxCore MC1000 Micro Switch MaxCore 1000 MaxCore Micro S6 1 OFF left side position ON right side position S6 2 OFF left side position OFF left side position S6 3...

Page 70: ...Controls Indicators and Connectors SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 70...

Page 71: ...nfiguration data Boot configuration for a flexible boot order The BIOS Setup program is required to configure the hardware of the card This configuration is necessary for operating the card and the pe...

Page 72: ...Exit after making a selection in the setup menus This procedure stores the selections displayed in the menus in CMOS At the time of next boot up BIOS configures the system according to the setup sele...

Page 73: ...s F9 to restore the system defaults Or 1 Press F2 to return to the BIOS setup 2 Go to the Exit menu and select Load setup Defaults The default BIOS values are loaded and the values will affect all set...

Page 74: ...a value for that field After that use Save Change Without Exit command in the Exit menu to save the values currently displayed in all the menus Table 5 1 BIOS Setup Menu Bar Menu Description Main Con...

Page 75: ...of the active selection is displayed Table 5 2 Legend Keys Key Function F1 Displays general help window Esc Exits the menu or the BIOS Setup program without saving any changes Left and Right Arrow Ke...

Page 76: ...p window The general help window describes the legend keys and their alternates as shown in the following figure The scroll bar on the right side of any window indicates that there is more than one pa...

Page 77: ...nu screen items scroll down the Main screen The following screen appears The following table provides the list of features that can be configured in Main menu By default the Main tab is selected on th...

Page 78: ...view Advanced menu select Advanced tab from the menu bar Use the legend keys to make a selection or exit in from the Advanced menu System Time HH MM SS Set the system time System Date MM DD YYYY Set t...

Page 79: ...other configurations shown in the Advanced menu are default values and need not be configured 5 2 2 1 Boot Configuration The following figure shows the Boot Configuration submenu Table 5 4 Advanced Me...

Page 80: ...following figure shows the Console Redirection Setup submenu screen The settings are applied to all ports if selected Individual submenus are available if there is a need for separate port configurati...

Page 81: ...tion Description Console Serial Redirection Enabled Disabled Enables or disables the Console Redirection Terminal Type VT_100 VT_100 VT_UTF8 PC_ANSI Selects the terminal type Baud Rate 115200 57600 38...

Page 82: ...O Force 80x25 Force 80x24 DEL FIRST ROW Force 80x24 DEL LAST ROW Selects the text mode resolution AutoRefresh Disabled Enabled Selects if the terminal will be refreshed after a console is detected Fai...

Page 83: ...from the menu bar Use the legend keys to make a selection and exit from the Security menu TheSecurity menuappearsas showninthe following figure The following table provides other options in the Secur...

Page 84: ...84 5 2 4 Power Menu To view the Power menu select the Power tab from the menu bar The Power menu is displayed which looks similar to the following figure Table 5 7 Security Menu Feature Option Descri...

Page 85: ...able provides options in the Boot menu and their default settings Figure 5 9 Boot Menu Table 5 8 Boot Menu Feature Option Description Boot Type Dual Boot Type Legacy Boot Type UEFI Boot Type Selects t...

Page 86: ...ded boot device ACPI Selection Acpi1 0B Acpi3 0 Acpi4 0 Acpi5 0 Selects the supported ACPI version USB Boot Enabled Disabled Enables or disables USB boot support EFI Device First Disabled Enabled Sele...

Page 87: ...ke a selection or exit to the main menu The Exit menu screen looks similar to the figure below The following table provides Exit menu features and their description The values shown in the tables encl...

Page 88: ...uration SATA Controller s fw_sata_mode ahci raid BIOS Setup Advanced PCH IO Configuration SATA Configuration SATA Mode Selection fw_sata_alpm on off BIOS Setup Advanced PCH IO Configuration SATA Confi...

Page 89: ...or 3 backplane USB fw_pci_spread off on BIOS Setup Advanced System Agent SA Configuration PEG Port Configuration PCIe Spread Spectrum Clocking fw_primary_display auto igfx peg pchpci sg BIOS Setup Adv...

Page 90: ...agement Control Turbo Mode fw_cpu_cstates off on BIOS Setup power Power Performance CPU Power Management Control CPU C State Control CPU C State fw_skip_shell off on BIOS Setup Advanced Boot Configura...

Page 91: ...ined selfspeaking names efisdcard EFI on board microSD sdcard legacy option on board SD card efiobsata EFI On board SATA efiiomsata0 efiiomsata1 obsata legacy option on board SATA efishell efinet4 MAC...

Page 92: ...BIOS SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 92...

Page 93: ...pgrades of PCIE 721x card 6 1 OS and BBS Information For more information about the OS and Basic Blade Services BBS software installation and booting procedure of a PCIE 721x card installed in MaxCore...

Page 94: ...Software Information SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 94...

Page 95: ...using Artesyn s SSF to upgrade Firmware components SSF is the preferred method to upgrade the MaxCore firmware For more information refer to System Services Framework for MaxCore Platform XML Interfac...

Page 96: ...isions ipmitool I lan H 192 168 201 9 U admin P admin hpm check A 1 2 Upgrade Procedure This section describes the step by step procedure to upgrade firmware images on a MaxCore MC3000 prototype Proce...

Page 97: ...support two firmware images active and inactive to be maintained Firmware upgrades via web browser are only supported by firmware revisions higher than v1 0 10 the BMC firmware revision can be retriev...

Page 98: ...A 98 To view more details open the Dual Image Configuration screen by clicking Firmware Update Dual Image Configuration In the Dual Image Configuration screen choose the required Image that need to be...

Page 99: ...7211 Installation and Use 6806800V01A 99 To open Firmware Update screen click Firmware Update Firmware Update from menu bar Figure A 2 Firmware Update Upgrade Do not modify the image to be updated Nev...

Page 100: ...LD ipmitool I lan H 192 168 201 9 U admin P admin hpm upgrade mc3000 cpld companion 0 2 6 hpm component 3 force 3 Upgrade the Glue CPLD You can skip this step if the Glue CPLD firmware already has the...

Page 101: ...ool I lan H 192 168 201 9 U admin P admin hpm upgrade mc3000 cpld iomod 0 4 0 component 4 force If you observe that the firmware upgrade fails repeat the firmware upgrade procedure again Firmware upgr...

Page 102: ...itool loads the firmware image into the BMC This may take some time 2min In the next step the ipmitool states Writing firmware 100 completed Please do not stop execution at this point ipmitool is stil...

Page 103: ...procedure If subsequent CPLD firmware upgrade fails contact your local Artesyn executive A 1 3 2 BMC FW Upgrade Failed In such a case power cycle the system and repeat the firmware upgrade If subsequ...

Page 104: ...MaxCore Firmware Upgrade SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 104...

Page 105: ...es of our product documentation 1 Go to www artesyn com computing support product technical documentation php 2 Under FILTER OPTIONS click the Document types drop down list box to select the type of d...

Page 106: ...Related Documentation SharpStreamer Pro PCIE 7210 7211 Installation and Use 6806800V01A 106...

Page 107: ......

Page 108: ...syn and the Artesyn Embedded Technologies logo are trademarks and service marks of Artesyn Embedded Technologies Inc All other product or service names are the property of their respective owners 2018...

Reviews: