background image

8

High Voltage Instrument Transformers | UG

User Manual

TESTS PROGRAM/

When

What

On arrival of the transformers at the warehouse or substation

A1

After unpacking

A2 - A3 - A4 - A6 - A8

During assembly

A2 - A3 - A4 – A5 - A6 - A8 - B1 - B3 - B4 - B6 - C1 - D2 - D3

After energizing

A7 - B7 - C1 - F1

Routine checks (weekly or monthly)

A2 - A7 - B7 - C1

Annual checks

A2 - A3 - A4 - A5 - A6 - A7 - A8 - B1 - B3 - B4 - B6 - B7 - C1 - F1

After re-connections, the load changes

A7 - B1 - B3 - B4 - B6 - B7 - F1

After the fault conditions, the short circuits, etc.

A3 - A7 - B1 - B3 - B4 - B6 - C1

See also “Careful check of the transformer” below.

After 1 year from start-up and after 5 years from start-up, if the 

values are normal and there is no considerable increase, perform 

an analysis after 15 years from start-up, and then every 5 years

E1 - E2 - E3

CAREFUL CHECK OF THE TRANSFORMER/

It is recommended that all regular tests be repeated after 

a long period of operation (about 20 years), or if a major 

network disturbance has occurred that could damage the 

transformer (e.g. a short circuit with current or duration values 

higher than the nominal ones, or over-voltages caused by the 

malfunctioning of the switches).

QUICK TROUBLESHOOTING GUIDE

Phenomenon

Control item

Cause 

Countermeasure 

Abnormal 

voltage 

indication

 

› Visual control

 

› Load control

 

› Measuring insulation 

resistance

 

› Analyzing gas

Internal issue

Contact ARTECHE

Partial discharges

Short circuit 

alarm in the 

secondary

Ferro-resonance

Loss of contacts

Repairing the issue

Contact ARTECHE

1.  Equipment name

2. Serial number

3. Type

4. Manufacture date

5. Description of the issue

6. Results of the controls

Strange 

noises, 

smells and 

vibrations

Winding short-circuit

Contact ARTECHE

Winding error

Relay trip 

and non-trip

Overload

Correct loading

Gas pressure 

drop

 

› Locate gas leaks

 

› Determine pressure losses

Deteriorated sealing

Contact ARTECHE

Surface corroded 

by the

sealing parts

Oxidation 

and 

corrosion

 

› Visual check

 

› Examine environment

Peeled-off coating

Repainting

Corrosive atmosphere

Insulation 

loss

Wet or contaminated 

Clean and dry off.

If the resistance 

is not restored in 

spite of your efforts, 

contact ARTECHE

Summary of Contents for UG-72 525 Series

Page 1: ...AL CONTENTS PRELIMINARY CONSIDERATIONS INTRODUCTION TRANSPORT AND HANDLING INSTALLATION INSPECTION AND MONITORING QUICK TROUBLESHOOTING GUIDE ANNEX I ANNEX II ANNEX III HIGH VOLTAGE INSTRUMENT TRANSFO...

Page 2: ...LATAM latam customersupport arteche com PRELIMINARY CONSIDERATIONS This product contains fluorinated gases covered by the Kyoto protocol with a global warming potential of 22800 GWP Take the necessary...

Page 3: ...ccidental overpressure by a pressure relief device rupture disk located at the top of the transformer Safety is increased by the use of synthetic insulators At the base of the transformer is the densi...

Page 4: ...sported both horizontally and vertically For transport the transformer should be properly attached to the packaging so as to avoid movement Load and unload the transformer slowly and avoid sudden move...

Page 5: ...e nominal pressure GAS FILLING The transformer will be delivered with a pressure of approx 0 5kgf cm2 0 05MPa relative inside Do not energize the transformer until it has been filled with gas in accor...

Page 6: ...ndary terminal box itself In case of secondary with intermediate taps the common terminal must be grounded Check that the secondary connections are correctly tightened and the contact surfaces are cle...

Page 7: ...o not establish any specific measures since the decision depends on the resources available to each user the location of the instrument transformer can be a position which is more or less critical the...

Page 8: ...pressure Check that the densimeter reading is in the green zone Dielectric tests D2 Measurement of the Insulation resistors For field tests the use of the megohmmeter Megger is very common and the tes...

Page 9: ...could damage the transformer e g a short circuit with current or duration values higher than the nominal ones or over voltages caused by the malfunctioning of the switches QUICK TROUBLESHOOTING GUIDE...

Page 10: ...User Manual Annex I High Voltage Instrument Transformers UG ANNEX I UG 72 525 HANDLING AND CONNECTION...

Page 11: ...1 User Manual Annex I High Voltage Instrument Transformers UG Fig 1 Lifting C Fig 2 Lifting Fig 3 Movement Fig 4 Movement...

Page 12: ...2 User Manual Annex I High Voltage Instrument Transformers UG Fig 5 Placement of the equipotential ring Fig 6 Placement of the equipotential ring Fig 7 Densimeter Fig 8 Neutral grounding...

Page 13: ...r Blushing Vales Rupture Disc M3 0 6 M4 2 M5 4 M6 4 41 4 41 6 4 4 M8 10 8 10 8 15 10 8 M10 21 1 21 1 30 21 1 M12 36 3 24 5 48 24 5 M14 60 30 M16 91 2 78 4 120 78 4 M20 177 90 230 90 M24 304 380 M30 60...

Page 14: ...ndards specifications when so requested All of it under a thorough quality system certified under ISO 9001 However it is normal for pre operative tests to be performed in order to confirm certain impo...

Page 15: ...this test often as the internal insulation could be damaged INSULATION RESISTANCE MEASUREMENT Primaries vs Secondaries Ground N S G Fig 1 The line cable of the measuring equipment must be connected t...

Page 16: ...ry red terminal TRANSFORMER RATIO TEST This test verifies the transformer ratio and polarity and displays a signal if correct and a signal if inverted To carry out the test proceed as follows Fig 3 Th...

Page 17: ...ARTECHE User Manual For more detailed information please visit us at arteche com Subject to change without notice MU_HV_UG_EN V A0 12 01 2021...

Reviews: