background image

17

NOTE:

Door Track Splice (painted part)

Step 4

B17

 Parts Needed For 

Door Track Assembly

 6617 Door Track Splice (1)

 9378 Door Track (2)

The door track assembly supports
the sliding doors and reinforces the
front wall. It is made up of three pieces.

Using the 

door track splice,

(painted), join the 

door track

(galvanized)

 

pieces

 

end-to-end as

shown.

Insert four screws 

from the under-

side only.

Hint: 

The holes in the top side of the

door track assembly are for fastening
the gable to the top of the front wall in
a later step.

 Position 

door slides 

onto the

legs, from the end of door track
assembly, as shown in the end view.

Set this piece aside for later use.

66769

STEP

3

94 5/8"   2,40m

STEP

4

END VIEW

STEP

1

9378

STEP

2

94 5/8"
2,40m

6617

9378

Long Leg
on Top

Short Leg
on Bottom

9378

9378

6617

66769

94 5/8"
2,40m

Summary of Contents for EN86-A

Page 1: ...G METAL PARTS 709321207 Model No EN86 A HM86 A HM86M MN86 A NP86 NW86 A NW86PC SA86 A VN86 A Owner s Manual Assembly Instructions B01 Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 8 x 6 97 1 2 x 68 3 4 43 230 99 3 4 71 1 4 67 7 8 94 3 4 66 66 5 8 43 1 2...

Page 2: ... the ground Available by mail order or at your local dealer or you may construct a foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these num...

Page 3: ...rk Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a com...

Page 4: ...ntrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call...

Page 5: ...ricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the ...

Page 6: ...erimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels plus five heavy duty snap in hangers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for gar...

Page 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7 ...

Page 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8 ...

Page 9: ... galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab The slab should be at least 3 to 4 8 10cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your foundation 1 x 4 s 2 5cm x 10cm w...

Page 10: ...bit and installation instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws ArrowAnchoringKit ModelNo AK4or60298 Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instruction AnchoringintoWood Post Use 1 4 Wood...

Page 11: ... 66183 Roof Trim Cap 2 right 2 left 66045 Handle 2 66646 Washer 275 8 sheets of 40 65109 8 32AcornNut 6 PackedwithScrews 67468 Peak Cap 2 ArrowLogo 65004 8Ax5 16 Screw 266 65923 8 32x3 8 Bolt 104 65900A 10Bx1 2 BlackScrew 8 PackedwithScrews 65103 8 32HexNut 104 Hardware B11 6228 Track Support 2 7916 RoofBeamBracket 4 66769 Door Slide 4 ...

Page 12: ...66 Right Roof Panel 2 10 8467 Left Roof Panel 2 11 8474 Roof Beam 3 12 8476 Side Wall Angle 3 13 9920 Side Wall Channel 2 14 8482 Side Roof Trim 2 15 8941 Ramp 1 16 8946 Side Floor Frame 2 17 8995 Wall Panel 4 18 9355 Vertical Door Brace 2 19 10488 Right Door 1 20 10488 Left Door 1 21 9363 Wall Panel 2 22 9900 Door Jamb 2 23 9924 Rear Wall Channel 2 24 9377 Rear Floor Frame 2 25 9378 Door Track 2 ...

Page 13: ...13 Assembly by Key No B13 ...

Page 14: ...erlap the rear floor frames as shown The holes in these pieces will align when the pieces are posi tioned with correct amount of over lap See the illustrations below for the proper overall length of the rear floorframe Jointheframesbyinsert ingfiveboltsintoframesetasshown 3 Double check the length of each and set these pieces aside for later use 14 Step 1 B14 Parts Needed For Floor Frame Assemblie...

Page 15: ...e rear wall channel pieces as shown in the figure and fasten the two pieces together with one bolt in the center hole three holes will align 2Overlaptherearwallanglepieces as shown in the figure and fasten them together with one bolt in the center hole 3 Set the assemblies aside You will use them later 9924 9924 STEP 1 RearWallChannel 94 5 8 2 40m 6615 STEP 2 6615 Rear Wall Angle 94 5 8 2 40m Rear...

Page 16: ...s join the two gables andsupporttheroofpanels Themain roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back with a roof beam and fasten together using ten screws 2 Set this piece aside for later use Assembled 8476 Side Wall Angle 8474RoofBeam Main Roof Beam STEP 1 ...

Page 17: ...lvanized pieces end to end as shown 2 Insert four screws from the under side only Hint The holes in the top side of the doortrackassemblyareforfastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of door track assembly as shown in the end view 4 Set this piece aside for later use 66769 STEP 3 94 5 8 2 40m STEP 4 END VIEW STEP 1 9378 STE...

Page 18: ...om the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected NOTE If you have purchased a Floor Frame Kit you need to install it at this time STEP 1 9377 RIGHT REAR 8946 8...

Page 19: ...rect panel in each position as shown NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall re quires a washer 19 3 Double check the part numbers of the wall panels be...

Page 20: ...embly across the middle of the rear wall using screws 3Fastenthesidewallanglesacross the inside top of the side panels us ing screws Side wall angles must overlap rear wall angle in corners 4 Fasten the side wall channels across the middle of the side panels usingscrews Fastenoverlapsinrear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels us...

Page 21: ... holes line up with the holes in the frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using a bolt and nut with two screws 5 When you have attached all wall panels in the correct positions the building will look like this STEP 2 9363 Panels rest on frame as shown 9363 8995 8995 8995 8995 Crimp...

Page 22: ...utsandacorn nuts as shown Push a plug into hole at center of jamb closest to door opening 2Fastenthetopofthe doorjambto the door track with two screws Do the same for the bottom into frame Repeat steps 1 through 2 for the opposite door jamb Cross Section Top View 1 STEP INSIDE OF BUILDING 2 STEP Plug 9900 Hex Nut Plug Acorn Nut TOP VIEW DoorTrack 9900 3 bolts Bolt F R O N T TOP VIEW DoorTrack TOP ...

Page 23: ...iece Carefully separate them before continuing 1 Attach the four roof beam brack ets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable Step 10 B23 Parts Needed For GableAssemblies 7906 Right Gable 2 7907 Left Gable 2 7916 Roof Beam Bracket 4 7907 Washer RoofBeamBrackets 7916 7906 FRONT 1 STEP ...

Page 24: ... On the rear gable use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable brace using boltsandnutsinthebottomtwoholes only 3 Repeat Steps 1 2 for the door track on the front of building except for the track supports fasten as shown 2 STEP 6658GableBrace Track Supports 6228 Gable ...

Page 25: ...asten the main roof beam to the gable brace of the front gable 2 Fasten the other end of the main roof beam to the gable brace of the rear gable 3Fastentheremainingroofbeams small holes on top as shown using bolts and nuts 1 STEP 8474 Roof Beam Main Roof Beam Assembly 2 STEP 3 STEP ...

Page 26: ...es will align Don t anchor the floor frame NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2Positiontherightroofpanelatthe back right corner and fasten to the gable with 5 bolts and nuts and roof beams using 2 screws Do not fasten the lower end of the panel to the ...

Page 27: ...8467 Left Roof Panel 2 7875 Roof Panel 4 8466 Right Roof Panel 1 2 Cut 2 short 2 5cm strips off the roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time NOTE If roof beam holes do not line up with the roof panel holes s...

Page 28: ...1 Ridge Cap 1 1 Install the ridge cap on the com pleted roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time 2 Fasten the lower end of the panels to the side wall angles using screws and washers 8461 STEP 2 STEP 1 ...

Page 29: ...n ger overbend the bottom flange of the side roof trim and roof panel rib at thecornerinwardenoughsotheright andleftrooftrimcapsfitontorightand left corners 3 Fasten the roof trim caps to the side trim using a screw 4 Fasten the roof panel ribs peak caps and ridge cap together using bolts and nuts Tuck Flange Inward to Fit Inside of Roof Trim Cap 8482 STEP 4 STEP 1 STEP 2 STEP 3 Peak Cap Roof Trim...

Page 30: ...bolts and nuts as shown 2 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace in place Fasten to door above and below center connection using 2 screws 3 Put a horizontal door brace onto the top edge and bottom edge and fasten with 1 bolt in the center 4Attachthelowerdoorguidesand bolts as shown 5 Repeat steps 1 throu...

Page 31: ...es in the door slides 3 Fasten the door to the door slides usingtwo 10Bx1 2 screwsperdoor slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Keep this Owner s Manual and Assembly Instructions for future reference STEP 2 HorizontalDoorBrace STEP 1 Gable STEP 3 10Bx1 2 Screw DoorSlide Adjustment Holes ...

Page 32: ...e rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handlin...

Reviews: